North Texas ~ New Build March 2012

We started excavation on March 16th, steel and plumbing on March 19th, Gunite on March 22nd and Waterline tile on March 24th. Everything is moving so quickly I haven't had time to start our post! I will add some pictures once I figure out how.

32 1/2 X 19
3.6" - 6'
Oklahoma Stone Coping
NPT Silverstone Ocean waterline tile
3 ft sheer descent with stacked stone wall
Ashlar stamped color concrete decking
3 Savi LED pool lights, one spa
Blue granite pebble sheen
Jandy E Variable speed pump
Jandy Stealth Waterfall Pump
Jandy DEL Filter
Jandy PDA PS4 Remote
RB 320 Chlorinator
UPP 15 Ozonator
Polaris 280 cleaner
Jandy LRZ heater
 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.