OK, tried to do this earlier but my first try didn't work out so well. Some issues with photos hosted on Webshots. Will try again with pics for posting as attachments.

We are first time pool owners. Our pool was recently completed by Supreme Pools and Spas (Spring, TX). They worked fast and did a great job. We are having some issues with the plaster which may necessitate drain, rework and refill. But Supreme is not giving us any static whatsoever in making it right. They worked the other punchlist items in a reasonable amount of time and to our satisfaction. I would not hesitate to recommend them to anyone building a pool in the north Houston area.

These first two pics were taken mid-Sept and show the area where the pool was to be installed.

[attachment=2:w8pdlj13]P1060397.JPG[/attachment:w8pdlj13]
[attachment=1:w8pdlj13]P1060399.JPG[/attachment:w8pdlj13]

Day 1 - we broke ground on Monday 6 Dec 2010.

[attachment=0:w8pdlj13]P1060632.JPG[/attachment:w8pdlj13]
 

Attachments

  • P1060397.JPG
    P1060397.JPG
    144.3 KB · Views: 583
  • P1060399.JPG
    P1060399.JPG
    152.8 KB · Views: 566
  • P1060632.JPG
    P1060632.JPG
    155.3 KB · Views: 566
Day 1 - cont'd.

[attachment=2:2edd6c9f]P1060650.JPG[/attachment:2edd6c9f]

"Hey Mister, we found your septic sprinkler line." (purple pipe in spa area)
[attachment=1:2edd6c9f]P1060655.JPG[/attachment:2edd6c9f]

[attachment=0:2edd6c9f]P1060658.JPG[/attachment:2edd6c9f]
 

Attachments

  • P1060650.JPG
    P1060650.JPG
    162 KB · Views: 564
  • P1060655.JPG
    P1060655.JPG
    174.8 KB · Views: 564
  • P1060658.JPG
    P1060658.JPG
    156.4 KB · Views: 564
Day 2 - rebar and gunite. I was at work all day and my wife was having some medical testing done so we weren't there to see the rebar. They were just about done when she got home.

[attachment=2:1f67rqiq]P1060662.JPG[/attachment:1f67rqiq]

[attachment=1:1f67rqiq]P1060664.JPG[/attachment:1f67rqiq]

Cans for the LED lights.

[attachment=0:1f67rqiq]P1060668.JPG[/attachment:1f67rqiq]
 

Attachments

  • P1060662.JPG
    P1060662.JPG
    82.5 KB · Views: 563
  • P1060664.JPG
    P1060664.JPG
    92.3 KB · Views: 563
  • P1060668.JPG
    P1060668.JPG
    76.9 KB · Views: 563
Day 5 - waterfall install (3 tons of moss rock)

[attachment=2:5abhi5xx]P1060669.JPG[/attachment:5abhi5xx]

Day 8 - coping and tile

[attachment=1:5abhi5xx]P1060794.JPG[/attachment:5abhi5xx]

[attachment=0:5abhi5xx]P1060795.JPG[/attachment:5abhi5xx]
 

Attachments

  • P1060669.JPG
    P1060669.JPG
    158.1 KB · Views: 562
  • P1060794.JPG
    P1060794.JPG
    148.7 KB · Views: 562
  • P1060795.JPG
    P1060795.JPG
    144.5 KB · Views: 562
Day 10 - decking forms and pour.

[attachment=2:lnpph9i5]P1060805.JPG[/attachment:lnpph9i5]

[attachment=1:lnpph9i5]P1060812.JPG[/attachment:lnpph9i5]

The mixer truck was about 200 feet from the gate. Lot of work haulin' it to the pool build but at least they had a big crew.

[attachment=0:lnpph9i5]P1060814.JPG[/attachment:lnpph9i5]
 

Attachments

  • P1060805.JPG
    P1060805.JPG
    141.9 KB · Views: 561
  • P1060812.JPG
    P1060812.JPG
    133.2 KB · Views: 561
  • P1060814.JPG
    P1060814.JPG
    121.3 KB · Views: 561
Day 10 cont'd

[attachment=2:24dtgumk]P1060824.JPG[/attachment:24dtgumk]

[attachment=1:24dtgumk]P1060834.JPG[/attachment:24dtgumk]

[attachment=0:24dtgumk]P1060835.JPG[/attachment:24dtgumk]
 

Attachments

  • P1060824.JPG
    P1060824.JPG
    95.4 KB · Views: 561
  • P1060834.JPG
    P1060834.JPG
    110.3 KB · Views: 560
  • P1060835.JPG
    P1060835.JPG
    93.1 KB · Views: 560
Day 11 - time for plaster

Mosaic turtles set in place.

[attachment=2:2g2kbxoe]P1060845.JPG[/attachment:2g2kbxoe]

Plaster crew setting up.

[attachment=1:2g2kbxoe]P1060846.JPG[/attachment:2g2kbxoe]

[attachment=0:2g2kbxoe]P1060847.JPG[/attachment:2g2kbxoe]
 

Attachments

  • P1060845.JPG
    P1060845.JPG
    101.1 KB · Views: 559
  • P1060846.JPG
    P1060846.JPG
    100.7 KB · Views: 560
  • P1060847.JPG
    P1060847.JPG
    96 KB · Views: 559
Day 11 - cont'd

[attachment=2:2dhn9s21]P1060856.JPG[/attachment:2dhn9s21]

[attachment=1:2dhn9s21]P1060858.JPG[/attachment:2dhn9s21]

[attachment=0:2dhn9s21]P1060897.JPG[/attachment:2dhn9s21]
 

Attachments

  • P1060856.JPG
    P1060856.JPG
    99.1 KB · Views: 559
  • P1060858.JPG
    P1060858.JPG
    100.6 KB · Views: 559
  • P1060897.JPG
    P1060897.JPG
    67.7 KB · Views: 559
Day 11 - cont'd

Just about done, need some more sponging.

[attachment=2:4uw6s55d]P1060900.JPG[/attachment:4uw6s55d]

[attachment=1:4uw6s55d]P1060903.JPG[/attachment:4uw6s55d]

Fill 'er up!

[attachment=0:4uw6s55d]P1060913.JPG[/attachment:4uw6s55d]
 

Attachments

  • P1060900.JPG
    P1060900.JPG
    52.7 KB · Views: 558
  • P1060903.JPG
    P1060903.JPG
    62.7 KB · Views: 558
  • P1060913.JPG
    P1060913.JPG
    86.7 KB · Views: 557
Some views of the pool after fill up.

[attachment=2:2tm9k63i]P1060915.JPG[/attachment:2tm9k63i]

[attachment=1:2tm9k63i]P1060920.JPG[/attachment:2tm9k63i]

[attachment=0:2tm9k63i]P1060924.JPG[/attachment:2tm9k63i]
 

Attachments

  • P1060915.JPG
    P1060915.JPG
    90.2 KB · Views: 556
  • P1060920.JPG
    P1060920.JPG
    113.4 KB · Views: 556
  • P1060924.JPG
    P1060924.JPG
    120 KB · Views: 556

Enjoying this content?

Support TFP with a donation.

Give Support
Waterfall prior to flow adjustment.

[attachment=2:2a1vv5j7]P1060921.JPG[/attachment:2a1vv5j7]

[attachment=1:2a1vv5j7]P1060923.JPG[/attachment:2a1vv5j7]

Eqpt pad and control box.

[attachment=0:2a1vv5j7]P1060933.JPG[/attachment:2a1vv5j7]
 

Attachments

  • P1060921.JPG
    P1060921.JPG
    130 KB · Views: 557
  • P1060923.JPG
    P1060923.JPG
    105 KB · Views: 557
  • P1060933.JPG
    P1060933.JPG
    134.8 KB · Views: 557
Sundek spray coating (Indian wheat) over existing covered patio.

[attachment=2:22teycym]P1070037.JPG[/attachment:22teycym]

And over the pool decking.

[attachment=1:22teycym]P1070039.JPG[/attachment:22teycym]

We feel the colors we selected for the coping, tile and Sundek worked out really well. I need to take some pics when the sun is shining to let the real colors show through.

[attachment=0:22teycym]P1070050.JPG[/attachment:22teycym]

Next comes the hard part (for me) - landscaping around the pool followed by an outdoor kitchen. The kitchen will be over wooden decking under a pavilion type structure to be built between the end of the pool decking and fence.

I will add progress pictures from time to time. Don't hold your breath waiting for those as I expect progress to be pretty slow. :cool:
 

Attachments

  • P1070037.JPG
    P1070037.JPG
    87.9 KB · Views: 560
  • P1070039.JPG
    P1070039.JPG
    99.5 KB · Views: 559
  • P1070050.JPG
    P1070050.JPG
    99.1 KB · Views: 559
Thanks. Many of the pictures are somewhat disappointing to me but we were hindered by the weather/seasonal conditions. Lots of cloudy days after the pool was started and this time of year we get very little direct sun on the yard due to it being low in the sky anyway and the tall trees that we have all around us. So needless to say, the lighting conditions have not been optimal for taking great pictures.
 
That looks great. Am I correct to assume that it took about 11 - 12 days for your pool build? I thought ours was fast for 23 days. Keep the pics coming.
 