OK,
Per my signature, I have Intellitouch and Screenlogic.
When I'm doing things with chemicals and I want to run the pump 24/7 how do I do that with my existing schedules?
I have not settled in on a pump schedule yet for the season but lets say I'm running the pump 6am-6pm?
I go and dump some chemicals (salt, cya , CH or what ever) If I want to then run my pump 24/7 what do I do?
Delete/disable the schedule then turn on Pool? (egg timer disabled)?
Per my signature, I have Intellitouch and Screenlogic.
When I'm doing things with chemicals and I want to run the pump 24/7 how do I do that with my existing schedules?
I have not settled in on a pump schedule yet for the season but lets say I'm running the pump 6am-6pm?
I go and dump some chemicals (salt, cya , CH or what ever) If I want to then run my pump 24/7 what do I do?
Delete/disable the schedule then turn on Pool? (egg timer disabled)?