    What would be the full scope of work for resurfacing a pool. Obviously removal and reinstall if new surface.
    Replacing all pvc items? If keeping existing tile, clean it? Redo the coping or sealing with silicone (between tile and deck)?



  2. Back To Top    #2

    In the Industry
    PoolguyinCT's Avatar
    Join Date
    Jul 2014
    Location
    Connecticut
    Posts
    438

    Re: Pool Resurfacing Scope of work

    That is up to the contractor & you. For both of your "protection" the scope of work should be itemized.



  3. Back To Top    #3
    Meadow's Avatar
    Join Date
    Jun 2016
    Location
    Temecula, CA
    Posts
    101

    Re: Pool Resurfacing Scope of work

    Quote Originally Posted by KDpoolguy View Post
    What would be the full scope of work for resurfacing a pool. Obviously removal and reinstall if new surface.
    Replacing all pvc items? If keeping existing tile, clean it? Redo the coping or sealing with silicone (between tile and deck)?
    It all depends on what you want. You need to discuss with your pool contractor what and whatnot!

    The problem is, in our region there is no such thing as off season for PB’s and small contractors. Licensed PB’s are in high demand all year round and prioritized their project based on profitability! You might find it very challenging to convince a pool contractor to come over for a quote. Good Luck with that! Based on my experience, a $20k pool remodeling work will not attract a hungry contractor in SoCal. Unless they are your relatives, friends or friend of a friend…

    Our pool is due for re-plaster, new tile and coping. Out of 8 local PB’s I called, only one showed up after numerous cancelations on his part. It took almost a month since initiation. I wasted no time and signed the quotation without looking any further. A sub con came over 2 weeks later and chipped off the plaster and waterline tiles. It took them half a day but left a pile of dirt in my yard since they came with a truck half full of dirt from another site.

    The expected time of completion is one month as agreed but the only work occurred as mentioned above was 4 weeks ago. To date, I have no idea when my PB will resume the work. I can only push enough and beg. No mention of down payment but I feel I am at my PB’s mercy and all I can do now is wait….

    So plan ahead and Good Luck….
    20k gallons, IG plaster with raised Spa, Hayward C-4000 cartridge, Hayward TriStar SP3202VSP, Hayward H400 gas heater, Hayward Super II (2HP) Spa jets, Hayward Swimpure Plus T-15,
    Intermatic PS3000 SPD, PureLine-PureColor LED's, Dolphin Triton cleaning robot, Taylor K-2006, K-1766, OTO Test kit & various Guess strips.

  4. Back To Top    #4
    Mod Squad Jimrahbe's Avatar
    Join Date
    Jul 2014
    Location
    Bedford, TX
    Posts
    5,102

    Re: Pool Resurfacing Scope of work

    KD,

    Those are three separate items and they will give you a price on each on..

    You will get a price on the new plaster with options for regular plaster, pebble, etc...

    You will get a price to replace the tile with options for standard tile and upgraded tile.

    You will get a price to replace the coping with options for the different types of coping.

    They normally replace the PVC eyeballs when they re-plaster.

    Here is the DFW area, they don't generally remove the old plaster by chipping it all off. If you want the old plaster removed you need to tell them and expect to pay more.

    Anything other than the above would have to be worked out between you and the contractor doing the job.

    I recommend you use a plaster company and not use a pool builder, who will just hire the subs anyway.

    Thanks for posting,

    Jim R.
    Finished in 2015 - 17K Gal, IG, 20' x 25' Almost Rectangular Pool, Pebble finish, three rockport water falls. Pentair Equipment: EasyTouch 4, IC40 SWG, 3 HP VS Pump, CCP520 Cartridge Filter.
    TF100 with SpeedStir and SampleSizer, ColorQ Pro 7, Dolphin Premier Robot Cleaner, added Screen Logic 2, added small 3 person Calder Spa.

  5. Back To Top    #5
    Meadow's Avatar
    Join Date
    Jun 2016
    Location
    Temecula, CA
    Posts
    101

    Re: Pool Resurfacing Scope of work

    @OP, not trying to hijack but Jim brought up an interesting topic that might serve your best interest.

    Quote Originally Posted by Jimrahbe View Post
    Here is the DFW area, they don't generally remove the old plaster by chipping it all off. If you want the old plaster removed you need to tell them and expect to pay more.
    @Jim, my next-door neighbor resurfaced their pool a few months ago and I recall, the old plaster was not completely removed. I am baffled because our plaster was completely removed and they even gone deeper in some areas exposing the rebar. What's the advantage of having all the plaster removed?
    20k gallons, IG plaster with raised Spa, Hayward C-4000 cartridge, Hayward TriStar SP3202VSP, Hayward H400 gas heater, Hayward Super II (2HP) Spa jets, Hayward Swimpure Plus T-15,
    Intermatic PS3000 SPD, PureLine-PureColor LED's, Dolphin Triton cleaning robot, Taylor K-2006, K-1766, OTO Test kit & various Guess strips.

  6. Back To Top    #6
    KDpoolguy's Avatar
    Join Date
    Mar 2017
    Location
    Palm Desert, CA
    Posts
    29

    Re: Pool Resurfacing Scope of work

    I’ve been doing commercial and rez property management for a while and am never surprised by carelessness and messiness of sub contractors. Many do great work...but they’re a wacky bunch.
    My pool builder was reasonably on top of everything, but could have improved contacting us about what to expect, when and estimated timeline. Our pebble is in, but some items I felt they went above expectations and left others to incompetent subs. I just wish I could expect a simple coat of silicone on our coping. One even jackhammered a hole in my obsolete, but prized floor cleaning system floor fittings ($11k option when we originally built pool in ‘86) really upset me, but I remedied it. They damage other stuff and are generally careless and making careless errors and are rough on things.
    I’m all on board to finding the subs myself, and doing a pool resurface by project managing it myself, but this time we added a pool shelf and our builder gave us a fair price and finished in just under 4 weeks so wife and I are happy. Boom, a simple resurface: Hire a plaster removal guy, tile cleaner and someone to install surface of your choice, probably save 30% off a PB, BUT, dealing with subs is recipe for a nightmare if you don’t know them & their tricks. So many have walked off with 10-20% material deposits and are never heard from again. A unexpectant homeowner will swiftly get taken by giving a sub even 50% payment and maybe has to wait months for job completion. Too much anxiety for my blood. DIY has its limitations.

  7. Back To Top    #7
    Mod Squad Jimrahbe's Avatar
    Join Date
    Jul 2014
    Location
    Bedford, TX
    Posts
    5,102

    Re: Pool Resurfacing Scope of work

    Quote Originally Posted by Meadow View Post
    @OP, not trying to hijack but Jim brought up an interesting topic that might serve your best interest.


    @Jim, my next-door neighbor resurfaced their pool a few months ago and I recall, the old plaster was not completely removed. I am baffled because our plaster was completely removed and they even gone deeper in some areas exposing the rebar. What's the advantage of having all the plaster removed?
    M,

    I have no idea what the difference is, but I had two pools resurfaced here and they just looked for hollow places and took those out, applied some type of bonding agent, and then re-plastered. They did not offer or even talk about taking all the plaster off. Most of the pools I have seen pictures of in CA. that were being re-plastered, seemed to have all the plaster removed first. I would assume removing the old plaster must increase the price by $2K or so.

    Common sense says taking it all off and starting over is better, but I'm not sure how much better...

    Thanks,

    Jim R.
    Finished in 2015 - 17K Gal, IG, 20' x 25' Almost Rectangular Pool, Pebble finish, three rockport water falls. Pentair Equipment: EasyTouch 4, IC40 SWG, 3 HP VS Pump, CCP520 Cartridge Filter.
    TF100 with SpeedStir and SampleSizer, ColorQ Pro 7, Dolphin Premier Robot Cleaner, added Screen Logic 2, added small 3 person Calder Spa.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •