FC-16, CC-0 will start monitoring the PH, others when levels are at normal
Slam nearly complete after 7 days of adjusting and monitoring. Starting OCLT now. If clear in AM I'm done. Oh Happy Days.
Question-
Drift down to normal levels- Do I wait till FC is below 5-7 to start adding Chlorine back in? Or should I add maybe half to 1/4 as much chlorine as required for shock level and ease it back that way?
It's been a chore, but, I have learned a good bit
I do have some staining and will start on that when I get the SLAM completed. I'll test to see if it is organic or metal when the rain stops tomorrow.
Thanks for all the input on my other post concerning the slam.
Jarhead
Slam nearly complete after 7 days of adjusting and monitoring. Starting OCLT now. If clear in AM I'm done. Oh Happy Days.
Question-
Drift down to normal levels- Do I wait till FC is below 5-7 to start adding Chlorine back in? Or should I add maybe half to 1/4 as much chlorine as required for shock level and ease it back that way?
It's been a chore, but, I have learned a good bit
I do have some staining and will start on that when I get the SLAM completed. I'll test to see if it is organic or metal when the rain stops tomorrow.
Thanks for all the input on my other post concerning the slam.
Jarhead