I have a concrete deck around the pool. It is 4' each side, 6' at the back, and about 8' in the front, where it joins with the concrete porch of the house. The 8' at the front is almost entirely split up by a drain channel. We are looking to put a larger roof over the porch, which would likely involve removing part of the very front of the pool deck in order to put in a footer, as I don't believe the pool deck is below the frost line. I'm wondering what the chances are of disturbing any bonding loop. Would it be likely that the deck would be bonded 8' away? I realize anything is possible, but I'm asking if anyone knows what the typical route of the bonding wire is....