New Pool in Central CA

Kim, the dark top soil will be used for shaping, and adding landscaping mounds around the pool and the rest will be used as fill in a low section of our property. I still could use more dirt too!! Last year a pool excavation company dumped 100 truck loads of dirt and I could probably use another 100.

Sent from my VS986 using Tapatalk
 
Here is some of the progress that has taken place over the last week or so. We had an inch of rain last week that set me back a few days but I think it's going well. Steel is scheduled for Wednesday. I still have the pressure test to finish today and install forms for the waterfall prior to steel.
0409160715a_zpsf3nktm35.jpg

YUN00001_zps2lblfbx1.jpg

YUN00049_zpszqm4pd8c.jpg

YUN00062_zpsza5ruvv7.jpg
 
Rebar was installed yesterday in 6 1/2 hours! Passed steel and bonding inspection this afternoon so now just waiting for gunite contractor to schedule. He said he might be able to shoot it tomorrow but I haven't heard back yet. I would like some feedback on the Pentair Globrite lights. I have 5 in the shallow end but want to make sure that is going to be enough light. I placed them all facing away from the house.

2016-04-20%2015.44.25_zpseesdx3v3.jpg



2016-04-20%2015.44.23_zpscz0d1wf2.jpg



2016-04-20%2015.44.27_zpsjbyglae3.jpg
 
It's been over a month since gunite. I have been pretty busy with work so I haven't spent as much time as I would have liked, but I feel pretty good for where it's at in the construction process. I know how I enjoy looking at other peoples pictures so I thought I would add some to give everyone an update that cares to look or follow along. I have only had about 7-8 good work days since gunite but here ya go

Start of gunite back on April 22nd. It's a good thing I looked at this picture because I just noticed one of my bonding wires coming off the rebar cage got covered up by the gunite! So I guess I know what will be at the top of the list for tomorrow. I looked through the rest of my pictures just to make sure no more were covered.

2016-04-22%2007.25.38_zpsn4xbgkq4.jpg



2016-04-22%2009.12.16_zpsclbl9qpt.jpg



2016-04-22%2012.21.37_zpsreuztjfk.jpg




This is where my stress level went up!! An hour after the gunite crew left it started pouring for about 30 minutes.

2016-04-22%2014.57.41_zpsndzjy530.jpg



Removed more dirt for the base material under the travertine deck
2016-05-15%2007.05.15_zpspypvkduo.jpg




Started the retaining wall around the equipment pad
2016-05-15%2007.06.15_zpssjosxj7j.jpg




I bought a water meter so when it comes time to fill the pool I will know exactly how many gallons it is, and it should also be easy to see if I have any leaks in the future.
2016-05-21%2008.43.44_zpsstw9xfnq.jpg




Picture with half of the base material in and compacted for the deck
2016-05-23%2013.50.20_zpsbivmqasp.jpg




The start of the first rock retaining wall
2016-05-25%2009.22.53_zpsi2tnenvt.jpg





Rock retaining wall done and ended up being 14ton!
2016-05-25%2011.34.48_zpstgxepdje.jpg




Waterfall will start next week so I'll add more pictures after that.
 
It's been a long time since I've posted any pictures of progress on the pool! I have had a busy last year with work and family so I haven't completed the pool yet. Last week marked a year ago that I broke ground on my pool and I was hoping to have this project well behind me by now. So I have many pictures of the progress so enjoy!


33465190790_aa658ec933_z.jpg


Most of the Rock complete


33036286363_a075ccfc72_k.jpg



33808733416_123b2850b3_z.jpg




33808747786_363952842e_z.jpg


Block wall for Swim up Bar

33808768716_0015321a61_z.jpg


Wall and Tile complete

33006404834_a733151ed5_z.jpg




33036329103_8f0e8c1c8b_z.jpg


Load Center and boxes installed

33036321113_03896d4cf9_z.jpg


Equipment Area

33465284770_f5b2c9e629_z.jpg


72 TONS OF ROCK!!!

33036358883_ec6ef109dc_z.jpg


Coping Started

33036365333_18e5f6f10e_z.jpg


Coping completed

33036370023_db4c50319f_z.jpg




33465304110_bcffbd5bb0_z.jpg


4 feet of water from all the rain this season!

33465306270_b5284e7c2a_z.jpg


Perimeter curb to lock in Travertine deck

33808814766_09468afc74_z.jpg




33808820186_b7d92d9645_z.jpg




33808823786_4783cc7911_z.jpg




33850054535_2ea65cfe0f_z.jpg


A lot of starring and head scratching went on this day to make it all go together.

33006757424_7ed7029d69_z.jpg


This is as of today.

The items left to do are finish the electrical, Decking, Safety fence, get final then Plaster
 
That was worth waiting for! SO much work has been done! WOW!

LOVE the boulders! Forget rocks those are BOLDders LOL

LOVE the waterline tile-BLING! What color of grout will you use?

I bet there was a lot of :confused: and :scratch: connecting all of the equipment! Glad it was not me trying to figure it all out!

Looks like you might be able to swim in the summer this year! Looks like someone has already been playing in the pool CUTE!

Kim:kim:
 