waiting till after winter to pour concrete deck?

Aug 9, 2015
30
macomb twp
My pool will be done in 2 weeks. I will get about 2 weeks to enjoy it. I want to wait to pour my concrete deck till after winter. Is that ok? The wife and i are undecisive about what we want. If it is ok, can i just buy a winter cover and hold it down with weights?
 
I've heard of that before and read that its actually kinda ideal.....you allow time for all the settling to take place and all that stuff.

Of course that's assuming you can stand to live with dirt all over the place??? Most folks I know would go nuts.... :/
 
Our pool was dug last fall and constructed to the point where the liner was installed and the pool filled with water. We then had it covered up for the winter and concrete was poured this past May. We definitely benefited from being able to regrade the areas that settled over the winter.
 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.