Search results

  1. G

    Electrictian coming. What extras do I need?

    absolutely you will want several properly grounded electrical outlets near the lounging area. Make sure they put the switch for the light close to the pool deck also. I wish I would have added at least one more outlet. I assume the electrician is also doing your bonding at the same time.
  2. G

    "New" DIY build in NC

    Awesome... you should have had a DIYNETWORK or HGTV crew taping it...
  3. G

    Drainage ditch, a worthy addition? or a waste of time?

    depending on your type of soil, that may not work. Consider piping the whole thing to a natural drainage area or using a holding type system to slow the flow onto your yard. We put in a small dry creek bed with stones to carry water to the drainage channel
  4. G

    my dog ate my pool equipment---seriously

    Ok..it took me two days but it is fixed. Sanding down the 1 1/4 inch pipe was a slow process even with an electric sander and once I installed it there was not enough contact for the old piece and new piece to bond. I let it set overnight but the new piece broke free. I then went to option 1...
  5. G

    my dog ate my pool equipment---seriously

    I guess I should explain.. thanks for the all the info.. I think it should be a fairly straight forward fix... anyway... as you can see in the before picture, the waste line has several L's in it to bring the pvc pipe to the ground level and then connecting to the blue waste line. The dog ( a...
  6. G

    my dog ate my pool equipment---seriously

    Ok great. sounds like I can try the 1 1/4" pipe idea... Here's a better look.
  7. G

    my dog ate my pool equipment---seriously

    Okay...can I fix this? Or this this a pool service issue?
  8. G

    New Pool - If you had to do it over again ... ?

    additional returns specifically on a step, more specific grading instructions to pb, better planned electrical outlets and switch (my fault)
  9. G

    Sweet!

    be careful of the uncompacted dirt... I'm 6 months post construction and already have cracks in the concrete b/c the concrete guy said the dirt and fill had settled enough.. plate compactors are about $60.00 a day to rent... replacing concrete...well ...not so cheap
  10. G

    Mulch or Grass

    Another view (sans the fence) looking from rear of house.
  11. G

    Mulch or Grass

    Concrete deck all the way around. This picture is a little old (we have added a fence around the pool and a wooden fence on 2 sides of the equipment.
  12. G

    Mulch or Grass

    Trying to finally finish the landscaping (cold, rainy weather has been a **Insert profanity** :rant: ). Anyway, I am in a bit of a disagreement with my landscaper and wife regarding weather to grass the area around the pool (which involves about 20 yards of topsoil being brought in) or starting...
  13. G

    Rain

    what impact does rain have on pool water. Our pool is still open and we've recieved just over an inch of ran in 2 days. The water level was a little low before the rain (intentionally b/c rain was coming). Does 1 " rain equal 1" increase in pool water level? What happens to the pH.
  14. G

    Screening around pool equipment

    Pool is done, i just need a touch of landscaping and it to pay the bills (I'm taking donations btw :sad: ). My pool equipment is outside of my chain link fencing and I'm looking for creative ideas to screen the pool equipment from veiw of the pool deck. I've looked at the big box home...
  15. G

    EZ POOL and new pics

    http://s742.photobucket.com/albums/xx67/grantandjerri27298/ Ok I give. EZ Pool might not be the best way. If I want to switch from EZ Pool, what would I switch to and how would I switch? I have read about the transition to BBB but what about other chlorine. Oh another update: PB says...
  16. G

    Picture Update

    http://s742.photobucket.com/albums/xx67/grantandjerri27298/?albumview=slideshow&newest=1 Here's where I am so far. 18x36 Fort Wayne IG pool. EZ POOL system.
  17. G

    Still Water Question

    Re: Still Water Question--UPDATE :hammer: So concrete guy was suppose to come today to start his work. I called last night about 6pm to inform him that we are cleared to proceed with concrete by the inspections department. He said that he decided not to come today but would wait until...
  18. G

    Still Water Question

    :rant: So construction is 2 and 1/2 weeks into progress. The pool is completely in along with an exterior water line, natural gas line and there is water in the pool. The electrician cannot finish until the concrete guy can lay the gridwork and the concrete guy's vacation and other projects...
  19. G

    Electrical Question

    maybe I should clarify. We envision the large 20x 10 area to be the primary lounging area since the gate and steps will interfere with the other area. The cheaper install location would be near the gate , bottom side of the attached drawing.
  20. G

    Electrical Question

    :?: I'm down to 8 days until construction and have to make final layout decisions tomorrow. I'm looking at installing an electrical outlet on the pool deck but am trying to balance the cost of installing the outlet on the lounging area versus the area closest to the equipment but at the...