    New Build in NE Florida (Finally)

    I had the same issue when they first pressured it up, I topped it off over the next couple days back to 40PSI. It does seem to take some time for the Air and water to equalize. I was told by an inspector that as long as it doesn't drop down to 0PSI than you should be fine. Not sure how your...
  2. I

    Tampa Pool Build (w/ Photos) - Tile & Coping Completed (07/16)

    I see this getting stretched out for another few months at the rates the subcontractors are moving. I have gotten several responses that rain has delayed them a week or so.
  3. I

    Tampa Pool Build (w/ Photos) - Tile & Coping Completed (07/16)

    Sorry it been a while. Watching this build is like watching grass grow. Its been 6 months since breaking ground. Before they could start tile and coping we needed to drain the pool due all the rain we have been getting. Last month they came out and completed the tile and coping but now we...
  4. 2021-08-06 16.15.25.jpg

    2021-08-06 16.15.25.jpg

  5. 2021-08-06 15.45.04.jpg

    2021-08-06 15.45.04.jpg

  6. 2021-07-13 13.50.37.jpg

    2021-07-13 13.50.37.jpg

  7. 2021-07-13 13.49.44.jpg

    2021-07-13 13.49.44.jpg

  8. 2021-07-13 13.50.01.jpg

    2021-07-13 13.50.01.jpg

  9. 2021-07-07 09.59.24.jpg

    2021-07-07 09.59.24.jpg

  10. I

    New Pool Build in Orlando, FL

    Your pool layout is very similar to our minus the spa. We are still in the process of building our so we haven't had a chance to experience the sunshelf . I attached our design of the step/sunshelf to give an idea on how we achieved the sunshelf depth we wanted. Also agree with Kat that you...
  11. Screenshot_20210714-055110_AutoCAD.jpg

    Screenshot_20210714-055110_AutoCAD.jpg

  12. Screenshot_20210714-055057_AutoCAD.jpg

    Screenshot_20210714-055057_AutoCAD.jpg

  13. Screenshot_20210714-055020_AutoCAD.jpg

    Screenshot_20210714-055020_AutoCAD.jpg

  14. I

    Tampa Pool Build (w/ Photos) - Tile & Coping Completed (07/16)

    It was installed parallel to the footer and under it directly. I think it would have been fine if it a few inches under the concrete but due to the recent rain events it uncovered the pipe which unturned failed the inspection. I guess it was a blessing in disguises to avoid future issue and...
  15. I

    Tampa Pool Build (w/ Photos) - Tile & Coping Completed (07/16)

    A little quick update after being away for so long. After about a month since we got the shell shot, the PB was able to get the plumber out here to get the piping ran partially back to the equipment pad area. The first plumber was a nightmare to get in site and getting the job even completed...
  16. DJI_0418.JPG

    DJI_0418.JPG

  17. 2021-06-13 20.08.54.jpg

    2021-06-13 20.08.54.jpg

  18. DJI_0351.JPG

    DJI_0351.JPG

  19. 2021-06-13 20.08.11.jpg

    2021-06-13 20.08.11.jpg

  20. I

    New FL Build - 5 Years Almost done planning

    I would think accessing the valve on the manifold would be a bit challenging if there are filter, pumps and heaters in front of them. Also, you would need to work around the equipment to modify the piping. This is how I have mostly seen it, piping and valves coming up in front of the pad. Are...
  21. 300px-Equipment_Pad_Complex.jpg

    300px-Equipment_Pad_Complex.jpg

  22. I

    New FL Build - 5 Years Almost done planning

    Where is your equipment pad going to be located? The piping seems a bit close to the wall.
  23. I

    WANTED Pictures of Wet Edge Caribbean

    Thank you Kim. I saw a few post but wanted to see if there were any negative with Wet Edge over Pebble Sheen.
  24. I

    WANTED Pictures of Wet Edge Caribbean

    We were given the option to changes from Pebble Sheen Blue Granite to Wet Edge Caribbean Blue for our pool finish. We wanted wanted to see if any one would be willing to share some pictures of their Caribbean Blue finish? Also, are there any cons on using Wet Edge over Pebble Sheen?
  25. I

    Tampa Pool Build (w/ Photos) - Tile & Coping Completed (07/16)

    Thank you Kim. The shell seem good. Was told that the PB will be bond coating it before the PebbleSheen. It seems like the next couple weeks will be progressing slowly. I will have plenty of time to go thru the links. The pool build was only giving test strips. I have already purchased...
  26. I

    Tampa Pool Build (w/ Photos) - Tile & Coping Completed (07/16)

    Shotcrete crew came out this morning and completed the shot by 2pm. Very professional and knowledgeable. I guess this is where construction slows down a bit. I will start the watering process this evening.
  27. 2021-03-10 13.52.35.jpg

    2021-03-10 13.52.35.jpg

  28. 2021-03-10 13.52.47 - Copy.jpg

    2021-03-10 13.52.47 - Copy.jpg

  29. 2021-03-10 13.50.39 - Copy.jpg

    2021-03-10 13.50.39 - Copy.jpg

  30. 2021-03-10 13.52.15 - Copy.jpg

    2021-03-10 13.52.15 - Copy.jpg