    Work is started on new Pool

    Yes for sure. we need to get inspections done before back fill. Keep fingers crossed it is Gov Inslee's state so that might not be possible
  2. mbutter104

    Work is started on new Pool

    Plumbing and electrical dropped in the trench today. hoping to finish up tomorrow and get inspection next week. Pressure test piping. Electrical will power 2 lights, autocover, outlet to pergola, and power to a 8 x 10 pool shed. Hopefully then can get back fill done.
  3. mbutter104

    Work is started on new Pool

    Thank you. Yes I am going to have the PB put something between the pipe and structure. It will be dirt back filled and over half will have artificial turf so I will still be able to dig it up if needed. Hopefully no time soon
  4. mbutter104

    Work is started on new Pool

    OK plumbing started. 2" piping. 2 skimmers separate lines and 2 bottom drains. Day 1 I had a concern with the PVC sitting on the sharp end of the support structure. I think there should be something between the pipe and the steel supports. Your thoughts?
  5. mbutter104

    It is a long way to the equipment

    Thanks for the heads up. I will find out tomorrow when the PB starts plumbing :)
  6. mbutter104

    It is a long way to the equipment

    James Yes 2 main drains and 2 skimmers. Why don't you tie the skimmers together? I have not seen the plumbing layout. Hopefully tomorrow. the changes to this design are 1 - Both skimmers are on the right side and we added a 1' safely ledge in the deep end. no fountains, bubblers or anything...
  7. mbutter104

    New construction, Southern Tampa area

    If you are going to wire it now and use later I know this is going to be an issue for me. I am thinking of maybe putting in a heat / cool pump (Pentair 140 Ultra Temp). This changes wire and breaker sizing. But regardless the electrical is going to have to be inspected on my job and we are...
  8. mbutter104

    It is a long way to the equipment

    The equipment will be above pool level on a pad around the corner of the house so 90's and 45's and sweep fittings. I will ask the PB tomorrow what size piping he will be running. As always thank you for your insight it is greatly appreciated. It has been almost 1 year for me on this forum doing...
  9. mbutter104

    New construction, Southern Tampa area

    Sounds like we are tackling many of the same issues with our new build. You can check out the progress and issues on this forum. The TFP team has been working with me to get it right for almost a year. We purchased these for the umbrella holders. We saw then at a resort on vacation and they...
  10. mbutter104

    It is a long way to the equipment

    Hi All, A few questions. We have started installing our new pool. The equipment pad is going to be about 85' from the last skimmer. I know I should have lots of questions about issues this will cause. Any recommendations or experience with this issue is appreciated! Here is where we are at...
  11. mbutter104

    Work is started on new Pool

    Thank you. Also working to put in an acid pump and integrate into the control system
  12. mbutter104

    Work is started on new Pool

    Hi it has not been purchased yet. This is what I specified. Pentair IntelliChlor IC60. any thoughts? or recommendations?
  13. mbutter104

    Work is started on new Pool

    Concrete Poured. My plan is to use the standard buckets for traditional lights and add the LED inserts based on all the feedback with LED light problems. This would allow easy replacement of the bulbs is there is an issue.
  14. mbutter104

    Work is started on new Pool

    Great Question! They have not ordered the equipment. 1) The Pentair IntelliCenter Pool Control System with WiFi is what i requested. Is there other details I need to specify? 2) IntelliChlor Pentair SWG 3) IntelliChem Acid Pump and tank (do i need to be more specific with the equipment...
  15. mbutter104

    Work is started on new Pool

    Concrete for forming pumped today. Tight squeeze to get the pump truck and mixer into the backyard. One BIG issue is WA is still under Phase 1 from COVID 19 and because of Gov Inslee NO inspections can be performed so NO backfill. Run plumbing and electrical and keep fingers crossed we can get...
  16. mbutter104

    Quick depth quesition for an inground liner pool.

    Thank you. Good Luck!
  17. mbutter104

    Work is started on new Pool

    We have remodeled our home 3 times over the last 25 years adding over 1,000 sq/ft. All made a huge disaster in the house. At least this is OUTSIDE! Yah
  18. mbutter104

    Work is started on new Pool

    What have I done!
  19. mbutter104

    Work is started on new Pool

    Thank you and we are going to need more than luck to get the plumbing to the pool!
  20. mbutter104

    Work is started on new Pool

    Steel and steps being installed. They will backfill the steps next along with concrete around the base of the steel. Plumbing and electrical coming
  21. mbutter104

    Work is started on new Pool

    This is the layout. We added a 1' safety ledge in the deep end. We moved both skimmers to the east side. One in the deep end and one in the shallow end. Two lights on the west side so they don't shine in our eyes when sitting in the pergola
  22. mbutter104

    Quick depth quesition for an inground liner pool.

    I know you say you don't want a deep end. Something to consider is someone jumping or diving into a shallow pool. To that end a close friends son dove into a shallow pool and broke his neck. The outcome was very sad for sure. Not sure if you can prevent everyone from jumping / diving in at all...
  23. mbutter104

    Work is started on new Pool

    Thank you all for the information getting me to this point. Here are the details and some progress pictures. Started on TFP a long time ago and gained so much information and insight on my plans. With COVID 19 this project got pushed back 2 months but we are underway! 18'X36' Vinyl (approx...
  24. mbutter104

    Robot recommendations for IG Vinyl Pool

    Good question. I am also looking for a recommendation but with a cord. I have seen several in this forum. New news from my builder that the Prowler maybe damaging his vinyl liner at the top as the Prowler crawls up. There are many small tears around the top of the liner. Has anyone hear of this...
  25. mbutter104

    New Build Eastern Washington June 2020

    Yes that is a tight fit for sure. No damage except for some underground sprinklers. They are a great team C2 Pools local here in Kennewick WA. Thanks for all you guys do getting me to this point. It has been SUPER helpful!
  26. mbutter104

    New Build Eastern Washington June 2020

    Not much room to run the plumbing around the house and put the equipment on the side
  27. mbutter104

    New Build Eastern Washington June 2020

    Not a great deal of room in our back yard to squeeze in our pool. Great Dirt here not a single rock.
  28. mbutter104

    New Build Eastern Washington June 2020

    Hi all I am back with my new build. Thank you all for the information getting me to this point. Here are the details and some progress pictures 18'X36' Vinyl (approx 24,000 gallons) Onxy Floor (Black) Liner CoverStar Auto cover (Charcoal) 3HP variable speed pump (Pentair) Clean &...
  29. mbutter104

    Our New Pool Build and The FUN (i.e. Stress) that Goes Along with it!

    Dear MeowMeow i am new here also and we are working on the details to put in a pool next spring. I have started a thread in the new pools. Although i can not be much help in your case i want to VOTE for this thread as "Best of the Year!" You have done an awesome job documenting, looking...
  30. mbutter104

    Looking for feedback on pool build please

    Having been poking around on this site for months looking at comments and also starting my thread on our new build. I would take the time and do the homework on many of these items. Get feed back and do some research. We are installing our first pool and the folks here are awesome with great...