New construction, Southern Tampa area

His argument was that it would help recirculate water from the bottom. Heat rising would keep the pool temps balanced. The charge is 1500 for the 3 heads, I can cancel that before they start the project.
That's just completely bogus. I hope you decide to spend your 1500 on something worthwhile. The physics of that makes no sense to me.
 
Sounds like we are tackling many of the same issues with our new build. You can check out the progress and issues on this forum. The TFP team has been working with me to get it right for almost a year. We purchased these for the umbrella holders. We saw then at a resort on vacation and they worked great in the wind. Saw them on Amazon $200
 

Attachments

  • umbrella stands.JPG
    umbrella stands.JPG
    75.1 KB · Views: 65
That's just completely bogus. I hope you decide to spend your 1500 on something worthwhile. The physics of that makes no sense to me.
Thanks, I was on the fence about it. I think I’m going to remove it and use that money towards a heat pump. We’re not adding it right now, but we are having them wire and plumb for it.
 
If you are going to wire it now and use later I know this is going to be an issue for me. I am thinking of maybe putting in a heat / cool pump (Pentair 140 Ultra Temp). This changes wire and breaker sizing. But regardless the electrical is going to have to be inspected on my job and we are having a licensed electrician do all the work. It is a long run for me from my panel to the control box. like 100'. And the panels in my place are getting maxed out for sure. so wire size, breakers and panel load are all in play. Just something to consider.
 
My irrigation reroute was around the same price with a new zone installed. Regrading and sod is another cost to factor in.
I was little over 4k with the irrigation reroute grading and replacing the sod without new landscaping.

Can you personal message me the sod/irrigation company you used. I'm also in Tampa and need to have that done now that the pool company graded the yard
 
Update: Permit took exactly one month for approval. PB took 2 weeks before they were out to remove existing screen and concrete pad.
They should start this week. Some building materials were dropped off on Friday. Construction manager was by today and placed the sign out front. Pics below.
I crossed out the name of the PB so as to not seem like I’m promoting any company.
 

Attachments

  • 8D86F10C-A2CA-492D-A83C-31E877993918.jpeg
    8D86F10C-A2CA-492D-A83C-31E877993918.jpeg
    757.1 KB · Views: 64
  • A89C5583-D0CE-4982-B84B-E8A5733A21C9.jpeg
    A89C5583-D0CE-4982-B84B-E8A5733A21C9.jpeg
    706.9 KB · Views: 71
  • 533C4D61-EEFD-4A0F-B8E9-C1020C877836.jpeg
    533C4D61-EEFD-4A0F-B8E9-C1020C877836.jpeg
    721.8 KB · Views: 73
A few updates, they laid out the pool a few days ago, today it was dug our and they keyed some plumbing. Tomorrow is rebar. I’ve been taking some time lapse videos with my GoPro and my phone. I attached a few photos for now.
Any ideas in the best way to post time lapse videos?
 

Attachments

  • F38D2164-A570-4AB2-A262-12D5581B0226.jpeg
    F38D2164-A570-4AB2-A262-12D5581B0226.jpeg
    767.7 KB · Views: 60
  • 364F28FD-AB39-4F2C-9E3B-3D702DF9C4EA.jpeg
    364F28FD-AB39-4F2C-9E3B-3D702DF9C4EA.jpeg
    639.9 KB · Views: 60
  • 38FF6814-077F-4F58-ADDF-1AE9C8E071D2.jpeg
    38FF6814-077F-4F58-ADDF-1AE9C8E071D2.jpeg
    827.5 KB · Views: 57
  • Like
Reactions: PoolNewb2
A few updates, they laid out the pool a few days ago, today it was dug our and they keyed some plumbing. Tomorrow is rebar. I’ve been taking some time lapse videos with my GoPro and my phone. I attached a few photos for now.
Any ideas in the best way to post time lapse videos?
Looking good. You're going to have a great view. Try Google Photos or YouTube to post time-lapse videos.
 

Enjoying this content?

Support TFP with a donation.

Give Support
Just remembered I didn’t upload a picture of the gunite. A few days before the walls started collapsing a little after a storm. The gunite crew came by and dig out the mud, pumped the water out, fixed the walls and shoot a thin layer of gunite. The next day they were here at 8:00 am and stayed until almost 5. A brief storm rolled by and created slight delay. I bought the crew some lunch and they were back shooting. Managed to finish everything. It’s been 4 days, going to call tomorrow to see what’s next.
 

Attachments

  • AF3F0A70-7452-4DFF-9B0D-2E02FEBC6A4F.jpeg
    AF3F0A70-7452-4DFF-9B0D-2E02FEBC6A4F.jpeg
    279.3 KB · Views: 69
  • 2C15B94A-A94D-451D-AE7D-C537628B1861.jpeg
    2C15B94A-A94D-451D-AE7D-C537628B1861.jpeg
    273.3 KB · Views: 72
  • DEF210BE-C1F2-4331-8495-2E033A193740.jpeg
    DEF210BE-C1F2-4331-8495-2E033A193740.jpeg
    341.3 KB · Views: 70
Plumbing was done last week. When they were done I noticed there was no auto fill. It was something I mentioned in discussing the build. Builder said they include it on every pool. But the construction manager said they hardly ever install them and the rep was probably talking about an overflow. I decided to leave it out but I'm still thinking about how often I'll be adding water o the pool. This is a Florida pool, any other Floridians care to tell me how often you top off the pool. Did I make a mistake leaving it off? I keep thinking about potential leaks not being noticed due to the overflow.
 
That's just completely bogus. I hope you decide to spend your 1500 on something worthwhile. The physics of that makes no sense to me.

I remember someone once posted about setting up his equipment pad so he could heat the pool with his main drains if he wanted. It’s probably a lot cheaper to do then the 1500 your builder wanted for the three floor returns. I’ll let other people address whether this idea makes sense. [/https://www.troublefreepool.com/threads/heating-options.117591/
below is the utube link to the video showing the guys system.
 
Last edited:
Finally made some progress on our build. Deck was mostly done today. They ran out of some pavers toward the end. Looks like it’s just down to screen, equipment and Pebbletec.
 

Attachments

  • 117DEFC2-A951-4E52-BBA0-9208D38C3B50.jpeg
    117DEFC2-A951-4E52-BBA0-9208D38C3B50.jpeg
    398.5 KB · Views: 76
  • 5EDC42A8-1ABA-4068-8FB7-0341ABB7FE22.jpeg
    5EDC42A8-1ABA-4068-8FB7-0341ABB7FE22.jpeg
    388.7 KB · Views: 75
Wow, progress has really stalled. I finally have a screen installed. They’re saying Pebblesheen is scheduled for Friday. I can’t imagine how. But we shall see. I still have a pipe that needs to be capped and buried. Electric hasn’t been done yet, and no equipment yet. Tomorrow I’ll be going to the builder and raising heck if none shows up.
 

Attachments

  • 4E3F7C64-BD4C-44F5-B70F-0669224A77D0.jpeg
    4E3F7C64-BD4C-44F5-B70F-0669224A77D0.jpeg
    653.7 KB · Views: 53
  • 8F95C601-2427-49B4-9EAB-065BB595EF34.jpeg
    8F95C601-2427-49B4-9EAB-065BB595EF34.jpeg
    542.5 KB · Views: 51
  • 4CA21036-A0DD-4211-B220-E4E25F8F80FF.jpeg
    4CA21036-A0DD-4211-B220-E4E25F8F80FF.jpeg
    592.7 KB · Views: 51
  • Like
Reactions: TampaKathy
Finally filling our pool. Almost 12 weeks since they started with the layout.
 

Attachments

  • 383C6F8A-E131-402A-9BA9-26EB9DCF13CC.jpeg
    383C6F8A-E131-402A-9BA9-26EB9DCF13CC.jpeg
    590.4 KB · Views: 57
  • 28300C54-52E2-406B-BEB5-57C9CE78CAA5.jpeg
    28300C54-52E2-406B-BEB5-57C9CE78CAA5.jpeg
    576.9 KB · Views: 56
  • 20E4E33D-35BC-4549-B1B0-344AC6B904BF.jpeg
    20E4E33D-35BC-4549-B1B0-344AC6B904BF.jpeg
    590.4 KB · Views: 56
  • 93571CED-A0CB-48B5-AE00-F008DA55AB77.jpeg
    93571CED-A0CB-48B5-AE00-F008DA55AB77.jpeg
    732.7 KB · Views: 57

Enjoying this content?

Support TFP with a donation.

Give Support
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.