Homestead
Volume: |
13500 Gallons |
Build Type: |
Vinyl |
1 lbs
of
Baking Soda
0.5 lbs
of
Dry Stabilizer
1 lbs
of
Dry Stabilizer
75 oz
of
Liquid Chlorine
• 10%
36 lbs
of
Dry Stabilizer
35 oz
of
Liquid Chlorine
• 10%
35 oz
of
Liquid Chlorine
• 10%
35 oz
of
Liquid Chlorine
• 10%
1.5 lbs
of
Dry Stabilizer
Vacuumed
48 oz
of
Liquid Chlorine
• 10%
26 oz
of
Liquid Chlorine
• 10%
1 L
of
Liquid Chlorine
• 10%
38 oz
of
Dichlor
Backwashed
1.17 lbs
of
Dry Stabilizer
2 lbs
of
Baking Soda
0.5 lbs
of
Dry Stabilizer
43 oz
of
Liquid Chlorine
• 10%
40 oz
of
Liquid Chlorine
• 10%
10 oz
of
Dry Stabilizer
100 oz
of
Liquid Chlorine
• 10%
60 oz
of
Liquid Chlorine
• 10%
40 oz
of
Liquid Chlorine
• 10%
60 oz
of
Liquid Chlorine
• 10%
10 oz
of
Liquid Chlorine
• 10%
40 oz
of
Liquid Chlorine
• 10%
2 lbs
of
Baking Soda
1 lbs
of
Dry Stabilizer
2 lbs
of
Baking Soda
17 oz
of
Liquid Chlorine
• 10%
Backwashed
17 oz
of
Liquid Chlorine
• 10%
69 oz
of
Liquid Chlorine
• 10%
Made adjustments to address cloudy water
18 oz
of
31.45% (20º Be) Muriatic Acid
Backwashed
18 oz
of
Dry Stabilizer
20 oz
of
Liquid Chlorine
• 10%
Vacuumed
Backwashed
2 lbs
of
Dry Stabilizer
63 oz
of
Baking Soda
9 oz
of
Dry Stabilizer
Vacuumed
Backwashed
Backwashed
OCLT in the AM for confrontation with cover off.
Removed cover and started 24 hour run with jet at the surface
1.1 lbs
of
Baking Soda
Passed OCLT Allowing to tapper down
2 lbs
of
Dry Stabilizer
Opened Pool
Backwashed
Stage one of opening. Pool still covered.
Partial closed. Adjusting ph
Closed Pool
Backwashed
60 oz
of
Liquid Chlorine
• 10%
20 oz
of
Liquid Chlorine
• 10%
4 lbs
of
Baking Soda
64 oz
of
Liquid Chlorine
• 6%
Backwashed
Pre-testing and starting plumbing repairs.
Pre-closing pool is covered and starting SLAM
Added 1 lb of CYA
Filled and running, added 15.8oz CYA
Pre test before opening
Closed pool
Vacuumed
Backwashed
Seeing small algae spots. Scrubbed and cleaned pool. Bumped FC back up after backwash
Backwashed
Backwashed
Backwashed
Seizing a little algae
Passed OCLT
Slamming pool
Getting algae
Seeing some algae
Pool Opened, added borates
Backwashed
Opening Pool
Slam level and closing.
Preparing to close pool
Partial drain done to lower CYA
Partial drain done to correct CYA
First recorded testing