Become a TFP Supporter Pool Math Forum Rules Pool School
Results 1 to 2 of 2

Thread: New Construction Planning - Need Advice

  1. Back To Top    #1

    Join Date
    Jun 2015
    Chula, GA

    New Construction Planning - Need Advice

    From what I've been reading it's a good idea to install a second return jet during construction. I've ordered a 24' Matrix and plan to put in in the ground around half way. What's the best method for cutting the new return jet hole and what's the best way to treat the exposed metal on the cut in order to prevent rust. If the extra return jet isn't needed, please let me know.

    In addition, would you hard plumb with 1 1/2" or 2" PVC?

    Here's my setup: 24' Matrix, Hayward X-Stream 100 ft^2 1 HP filter/pump, Hayward Aquatrol HP SWC.

    Thanks for your help.
    24' Matrix Pool, Hayward Xstream Matrix 100 Ft^2 1 hp Filter, Hayward Aquatrol HP Chlorinator, Confer curve steps with add on, Smart Pool Nightlighter 100-Watt Light, Taylor K-2006 test kit

  2. Back To Top    #2

    In the Industry
    duraleigh's Avatar
    Join Date
    Apr 2007
    Sebring, Florida

    Re: New Construction Planning - Need Advice

    Sorry no one has answered.

    2 returns on a 24' AG pool makes sense to me.

    Will the matrix folks help you?
    Dave S. - Forum owner
    42k vinyl and concrete pool, 1.5hp pump, 140gpm filter
    TFTestkits , PoolMath , Pool School

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts