Become a TFP Supporter Pool Math Forum Rules Pool School
Results 1 to 3 of 3

Thread: NEW pool in 2 weeks

  1. Back To Top    #1

    Join Date
    May 2015
    phoenix, az

    NEW pool in 2 weeks

    I'm building a new pool here phx. I have 425spa that I changed over to the bbb method. 6 weeks ago I added borax and it has eliminated the constant need for acid. In six weeks I have not added any acid vs weekly before. My question is can I borax to a brand new pool? it will be completed in 2 weeks.
    pool finished 6/17/2015 10000 ig plaster, Pentair 3hp pump, 420 cart filter, in floor cleaning, phoenix, az

  2. Back To Top    #2

    In the Industry
    duraleigh's Avatar
    Join Date
    Apr 2007
    Sebring, Florida

    Re: NEW pool in 2 weeks

    My question is can I borax to a brand new pool?
    Within reason. In pool chemistry, borax is used to raise pH and TA so you can't toss in any old will have to carefully test your pool water first and dose appropriately.

    If you want to add borates (not borax) there is an article in Pool School that will be helpful.
    Dave S. - Forum owner
    42k vinyl and concrete pool, 1.5hp pump, 140gpm filter
    TFTestkits , PoolMath , Pool School

  3. Back To Top    #3
    Mod Squad
    Join Date
    Aug 2012
    DFW, TX

    Re: NEW pool in 2 weeks

    TFP Moderator
    If TFP helped you or saved you money - Become a TFP Supporter! <--Click here
    2012 build and pics, 20k gal gunite, black onyx pebblesheen, OK flagstone, IntellifoVS, cart filter w/Pleatco, IC40 SWG, Solartouch, 5 12'x4' solar panels, HP50HA heat pump, 8mil solar cover, borates, TF-100 test kit, SONOS, Doheny's Discovery Robot, hot tub on bleach

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts