We have just installed our above ground 22 x 52 intex ultraframe. It is almost full and one side is 3 inches deeper than the other. I am afraid to drain and redo because of possible tears or pinholes in the liner from making adjustments. Has anyone had this problem and survived the summer with a little unlevelness?