    New Construction: Electric AFTER Plaster?

    Hey, guys. I'm new to this forum and we're currently having our first pool built. and I think our builder is going to give me an ulcer. We started on February 6 and we're still not finished. We did have some snow...and a lot of rain, but we have also had A LOT of wasted days. And a LOT of excuses. In the beginning, he told us 8 weeks was our "worst case scenario" and we're now on week 14.

    My concern today is that we're FINALLY scheduled for plaster tomorrow (supposedly), but the electrical work hasn't been done. Is that okay? I've read that the filter should be running as soon as the pool is full, so my guess is no.

    And, as for the electrician, who provides him with the equipment? Does he bring it? Or does the builder give it to him? I was told electric would cost in the ballpark of $1200-$1500.

    Honestly, my fear is that he'll do the plaster and then we'll never hear from him again because we are supposed to pay the electrician and not the builder for the electric. I'm worried we could get screwed and not get the equipment for the electrical work. He still owe's us a a safety cover, too.

    What we have left to pay is the plaster portion of the contract, the electrical (that goes to the electrician), and the final closing fee of around $1200.

    So, you see my concern? I'm worried that I'll pay him for plaster and never see him again...and I won't have the pumps/electrical equipment or the cover...so, basically he'll owe me more than I owe him after the plaster.

    Ugh. Please advise.

  2. Back To Top    #2

    Join Date
    Jun 2011
    Location
    Carlsbad, NM
    Posts
    165

    Re: New Construction: Electric AFTER Plaster?

    I would want to have my pump running within 24 hours of plaster.
    36' x 18' 20k in ground, Finest Finish grey plaster, Pentair Tagelus 100D sand filter, Hayward Northstar 2hp pump, Jandy LRZ125EN heater, spill over spa, iaqualink controlled automation, Stenner chlorination, natural rock and flagstone coping, 1" glass mosaic waterline tile, SR Smith Vortex slide.

  3. Back To Top    #3
    Patrick_B's Avatar
    Join Date
    Jun 2011
    Location
    Midland TX
    Posts
    15,001

    Re: New Construction: Electric AFTER Plaster?

    Use the final payment until everything is done. Pay the electrician, get that done, but you hold the power with the final installment. If he won't plaster until he's paid, you chose a poor builder. Plaster, cover, pool up and running and all ok before you make the last payment.
    TFP Moderator
    Essential Links:
    ABC's Of Pool Chemistry, Test Kits, SLAM Your Pool
    28K Gal IG FreeForm, CLI Quartz, Pentair 36"SF & VS Pump, Dolphin M5, Rheem

  4. Back To Top    #4
    Mod Squad pooldv's Avatar
    Join Date
    Aug 2012
    Location
    DFW, TX
    Posts
    23,994

    Re: New Construction: Electric AFTER Plaster?

    MyPB delivered the equipment, plumbers installed it and electrician connected to electricity.

    If he won't plaster until you pay that is probably good. Tell him you aren't paying until the equipment is installed.
    TFP Moderator
    If TFP helped you or saved you money - Become a TFP Supporter! <--Click here
    2012 build and pics, 20k gal gunite, black onyx pebblesheen, OK flagstone, IntellifoVS, cart filter w/Pleatco, IC40 SWG, Solartouch, 5 12'x4' solar panels, HP50HA heat pump, 8mil solar cover, borates, TF-100 test kit, SONOS, Doheny's Discovery Robot, hot tub on bleach

  5. Back To Top    #5

    Join Date
    May 2015
    Location
    Arkansas
    Posts
    15

    Re: New Construction: Electric AFTER Plaster?

    He will plaster and then want me to pay immediately after. Same day. That's what we've been doing and it has been fine so far, but I'm getting worried now about the fact that we have no equipment for the electrician and so little left to pay.

    I would have felt better if the electric job/equipment were installed and paid for before the plaster.

  6. Back To Top    #6
    Patrick_B's Avatar
    Join Date
    Jun 2011
    Location
    Midland TX
    Posts
    15,001

    Re: New Construction: Electric AFTER Plaster?

    I stand by what I said earlier. Be careful.
    TFP Moderator
    Essential Links:
    ABC's Of Pool Chemistry, Test Kits, SLAM Your Pool
    28K Gal IG FreeForm, CLI Quartz, Pentair 36"SF & VS Pump, Dolphin M5, Rheem

  7. Back To Top    #7
    Mod Squad pooldv's Avatar
    Join Date
    Aug 2012
    Location
    DFW, TX
    Posts
    23,994

    Re: New Construction: Electric AFTER Plaster?

    I think that I would tell the PB that you do not want plaster until the equipment is installed and wired. And that if he does plaster that you do not intend to pay for it until the equipment is installed and running. Not being able to circulate and filter your water after a new plaster job is not good.
    TFP Moderator
    If TFP helped you or saved you money - Become a TFP Supporter! <--Click here
    2012 build and pics, 20k gal gunite, black onyx pebblesheen, OK flagstone, IntellifoVS, cart filter w/Pleatco, IC40 SWG, Solartouch, 5 12'x4' solar panels, HP50HA heat pump, 8mil solar cover, borates, TF-100 test kit, SONOS, Doheny's Discovery Robot, hot tub on bleach

  8. Back To Top    #8
    Patrick_B's Avatar
    Join Date
    Jun 2011
    Location
    Midland TX
    Posts
    15,001

    Re: New Construction: Electric AFTER Plaster?

    That wouldnt be a bad plan.
    TFP Moderator
    Essential Links:
    ABC's Of Pool Chemistry, Test Kits, SLAM Your Pool
    28K Gal IG FreeForm, CLI Quartz, Pentair 36"SF & VS Pump, Dolphin M5, Rheem

  9. Back To Top    #9

    Join Date
    Nov 2013
    Location
    Central Texas
    Posts
    113

    Re: New Construction: Electric AFTER Plaster?

    Few questions.

    1. Is the electrician sub by you or builder?
    2. Heated pool?
    3. After plaster does the builder plan on doing an acid bath for 2 weeks? If he plans on doing an acid bath after the plaster then he is probably going to say the equipment will be installed during this period. If he is doing an acid startup you don't want to run the pump during this period because of the low PH. If your pool is heated you also don't want that acid getting to the heater.
    28k gal/raised spa, IG quartzscape, WhistperFlo 2 speed B2984T,DEV60 filter,Lxi400 NG heater, Polaris 280 cleaner, DIY Chlorine injection, Build completion 7/2013

  10. Back To Top    #10

    Join Date
    May 2015
    Location
    Arkansas
    Posts
    15

    Re: New Construction: Electric AFTER Plaster?

    Quote Originally Posted by JonnyB View Post
    Few questions.

    1. Is the electrician sub by you or builder?
    2. Heated pool?
    3. After plaster does the builder plan on doing an acid bath for 2 weeks? If he plans on doing an acid bath after the plaster then he is probably going to say the equipment will be installed during this period. If he is doing an acid startup you don't want to run the pump during this period because of the low PH. If your pool is heated you also don't want that acid getting to the heater.
    The electrician is sub by the builder. I think he's going to do an acid wash after the plaster? We won't have a heater. It will be a salt system.

    Thanks, everyone, for the feedback.
    8000 gallon, finished 6/15, IG, Plaster (Diamond Brite Midnight Blue), Sand Filter, Pentair, HTH 6 way test kit, SWG, filled with city water

  11. Back To Top    #11

    Join Date
    Nov 2013
    Location
    Central Texas
    Posts
    113

    Re: New Construction: Electric AFTER Plaster?

    Ok if they are just doing an acid wash then yes everything needs to be hooked up and ready to go once filled.
    28k gal/raised spa, IG quartzscape, WhistperFlo 2 speed B2984T,DEV60 filter,Lxi400 NG heater, Polaris 280 cleaner, DIY Chlorine injection, Build completion 7/2013

  12. Back To Top    #12

    Join Date
    May 2015
    Location
    Arkansas
    Posts
    15

    Re: New Construction: Electric AFTER Plaster?

    I should add that my paranoia is fueled by an issue that we had with our decking. He didn't measure correctly (or at all) and poured too much. He wanted us to pay the overage even though it was his mistake. We agreed to pay about half ($700), but it left a bad taste in my mouth and some trust was lost. He guilted us into paying even though it wasn't in our contract and it was his mistake. He really wanted us to pay it all, but we didn't. I'm a fair person, and I know we'll be glad for the extra decking, but the way it all happened and our conversation about it has really bothered me. And we're on a strict budget. I just want this pool to be done and the builder chasing to be over.
    8000 gallon, finished 6/15, IG, Plaster (Diamond Brite Midnight Blue), Sand Filter, Pentair, HTH 6 way test kit, SWG, filled with city water

  13. Back To Top    #13
    Divin Dave's Avatar
    Join Date
    Oct 2013
    Location
    Longview, Texas
    Posts
    4,926

    Re: New Construction: Electric AFTER Plaster?

    Usually the $ can be worked, though it may be uncomfortable, it can be worked out.

    My concern is for your pool. Once the plaster is in, it needs to be filled with water right away and you need the capability to cirucluate the water immediately after its full. So,,, you need the equipment and electrics done
    by the time the pool is full of water. You dont want plaster sitting in open air any longer than whats absolutely necessary.

    Plaster is forumulated to be under water.
    Divin Dave,
    IG Vinyl, 15' x 30', 3 1/2' - 6' deep, Oval, ~15K gal, Intelliclor IC40, Intelliflo VS pump, Clean and Clear 420 Filter, auto-fill-disabled, Retrofit LED Color Light, Dolphin Nautilus Robot, TF100 Test Kit, Taylor K1766 Salt Test Kit, Tftestkit Pressure Gauge.
    www.tftestkits.net Experience- it's what's learned just after you needed it most !!

  14. Back To Top    #14

    Join Date
    May 2015
    Location
    Arkansas
    Posts
    15

    Re: New Construction: Electric AFTER Plaster?

    Quote Originally Posted by Divin Dave View Post
    Usually the $ can be worked, though it may be uncomfortable, it can be worked out.

    My concern is for your pool. Once the plaster is in, it needs to be filled with water right away and you need the capability to cirucluate the water immediately after its full. So,,, you need the equipment and electrics done
    by the time the pool is full of water. You dont want plaster sitting in open air any longer than whats absolutely necessary.

    Plaster is forumulated to be under water.
    That's my concern, too. I texted him and asked that (if he had the electrician scheduled for Wed since he's plastering tomorrow) at 8:30 this morning and he hasn't responded.
    8000 gallon, finished 6/15, IG, Plaster (Diamond Brite Midnight Blue), Sand Filter, Pentair, HTH 6 way test kit, SWG, filled with city water

  15. Back To Top    #15

    Join Date
    Jul 2014
    Location
    Independence, KY
    Posts
    204

    Re: New Construction: Electric AFTER Plaster?

    Remember that at this point, the schedule really isn't important, what is important is to get a quality pool that will last. If it were me, I would be there when the plasters people show up, and tell them to not work. Sit down with the builder, and finalize the schedule for open items and payments. Be clear that you will not make the last payment until you have a pool that is fully functioning and has passed any inspection if applicable. Be nice, fair and reasonable, and things will work out well. I would try to not bring up past issues or delays unless the conversation takes a negative turn and is necessary. I would just say that as the end is near, you want to be certain on all of the finishing timeline
    IG W/Vinyl Liner Oval 18x40, 21K gal, Oval 3'-8'
    Pentair Intelliflo VS Pump, Sand Filter

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •