I have setup a Stenner pump to inject bleach using my Aqualink. I can only program 2 times of day to run the pump. When are the best times of day to inject chlorine into the water? What are the consequences if the FC drops to below the min FC level per my CYA for a small duration during the injection windows? Is it possible to guarantee FC does not drop below min levels without going over the target FC when I inject?
Thanks
Thanks