hello all. Newbie here from LA. Last year we put up our Intex 24' pool. Everything was great until one side sunk and we ended up with a 5" difference from one side to the other. I took the pool down at the end of the summer, and I am planning on leveling the ground and using pavers to support the legs. My question is, can I till up the dirt, level it, then pack it down? will this give me a sufficient base for the pool? I have 6-8 weeks before I put the pool back up, would this give the dirt time to pack down solid with watering and tamping? any advice would be appreciated.