Since I was going to install a heater bypass with 3 ball vales, should I bother also installing a 5lb check valve? Is there any advantage to installing the check valve? Seems redundant as I can always open the bypass valve if the flow rate to the heater exceeds 70GPM.
Thoughts?
Thoughts?