Hi, I'm new here! I drained my pool and scrubbed it down with a diluted bleach solution and rinsed to hopefully kill off the rest of the algae that had grown over the last 2 months. I tested my fill water with the TFT100 and here are the results:
CH 300ppm
TA 120
PH 7.8
Chlorine 0.5
CYA 0
The pool is currently still filling. So here are my questions:
1. Do I wait until the pool is completely full to add all needed chemicals?
2. Since I had an algae problem do I SLAM the pool to get rid of any residual algae growth?
3. What "Stabilizer" should I use?
Thank you! I'm looking forward to my first happy summer with a TFP!
CH 300ppm
TA 120
PH 7.8
Chlorine 0.5
CYA 0
The pool is currently still filling. So here are my questions:
1. Do I wait until the pool is completely full to add all needed chemicals?
2. Since I had an algae problem do I SLAM the pool to get rid of any residual algae growth?
3. What "Stabilizer" should I use?
Thank you! I'm looking forward to my first happy summer with a TFP!