My plaster is a little over a month old. I did a full set of tests today:
PH - over 8 (added 29oz of acid per pool math, having to add acid almost daily).
TA - 80 ppm
CH - 230 ppm
FC - 3.6 ppm
CYA - 30 ppm
Salt - 2900 ppm
** My question is on the CYA. I did the test using a Taylor K-2006 kit. I could still see the black dot at the bottom of the tube at the highest mark (30) but it was a little cloudy. According to pool math I should add 294 oz of liquid stabilizer for a goal of 80 ppm CYA. This seems a lot but I am new to all this. Is there a particular stabilizer/conditioner I should use and should I start it off with maybe 150 oz or so and retest? What problems are there if I add too much stabilizer/conditioner? THANKS
PH - over 8 (added 29oz of acid per pool math, having to add acid almost daily).
TA - 80 ppm
CH - 230 ppm
FC - 3.6 ppm
CYA - 30 ppm
Salt - 2900 ppm
** My question is on the CYA. I did the test using a Taylor K-2006 kit. I could still see the black dot at the bottom of the tube at the highest mark (30) but it was a little cloudy. According to pool math I should add 294 oz of liquid stabilizer for a goal of 80 ppm CYA. This seems a lot but I am new to all this. Is there a particular stabilizer/conditioner I should use and should I start it off with maybe 150 oz or so and retest? What problems are there if I add too much stabilizer/conditioner? THANKS