IG Pool remodel in Tempe AZ

Crew is back out here today and just started the plumbing.

Today they are installing my automatic water leveler, dedicated suction line for my pool vac and plumbing in my new filter and swg system.

Getting rid of this.
sydeqyva.jpg


Installing water leveler right now.
qyna4y3e.jpg


Sent from my SM-G900V using Tapatalk
 
They finished installing the auto water leveler today, the dedicated vacuum line, the salt cell and my new filter.

Pump area
zu5e7ydy.jpg


Water leveler of which they tied into my irrigation line. You can see the box at the top of the photo.
y2azyqa3.jpg


Sent from my SM-G900V using Tapatalk
 

Enjoying this content?

Support TFP with a donation.

Give Support
Guess those doggies won't be able to lay down on the shelf :splash:
nice progress

Their doxies and hate the water. Even if they could touch on the shelf they wouldnt get in the water.

Looks like rebar tomorrow and then shotcrete either Thursday or Friday. Then they'll finish electrical, put all new plastic fittings in, clean up and then put the pebble radiance interior in, then acid wash and top it off with water with an estimated finish time of November 6th
 

Enjoying this content?

Support TFP with a donation.

Give Support
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.