New!! ya
Ive read A quite deal of all the great info on this site Thank You! Timer clock split time 4hrs morning and 4 hrs evening, 80% skimmer 20% main plumbed separate. We are a week in after plaster
morning numbers are
FC 5
Tc 5
PH 7.8-8.0 added 11oz just now
Ta 76
Ch 360
CyA 30
Temp
91
Im using bleach as suggested and realize bleach is ph neutral(how long for it to gas off/??) im battling with the ph I believe because of new plaster(although i no longer see it while brushing 3 times a day)
The ?, should i get ph down in the morning lets say to 7.4 using MA then and bleach in the evening? (And possibly added bleach midday as im losing 2 FC)
I see on a new pool we want to add bleach slowly.
P.s. No bather load until we get everything settled
Ive read A quite deal of all the great info on this site Thank You! Timer clock split time 4hrs morning and 4 hrs evening, 80% skimmer 20% main plumbed separate. We are a week in after plaster
morning numbers are
FC 5
Tc 5
PH 7.8-8.0 added 11oz just now
Ta 76
Ch 360
CyA 30
Temp
91
Im using bleach as suggested and realize bleach is ph neutral(how long for it to gas off/??) im battling with the ph I believe because of new plaster(although i no longer see it while brushing 3 times a day)
The ?, should i get ph down in the morning lets say to 7.4 using MA then and bleach in the evening? (And possibly added bleach midday as im losing 2 FC)
I see on a new pool we want to add bleach slowly.
P.s. No bather load until we get everything settled