Thread: Explain how to compact crusher in 3" lifts

  1. Back To Top    #1

    Join Date
    Jul 2014
    Location
    Nederland, TX
    Posts
    8

    Explain how to compact crusher in 3" lifts

    Quote Originally Posted by Casey View Post
    They make temporary roads out of the stuff and run heavy machinery on top of it... It's good stuff! Get your frame level and wait for the crusher and get to it. Remember, 3" lifts with a plate compactor.
    Sorry, newbie here (and actually haven't even started my project; will have to wait til next summer) just reading as much as I can before break ground. But could someone (Casey?) describe/explain what it means to do 3" lifts when compacting the crusher run... I've 'googled' it but keep getting info on 3" lift kits for trucks and jeeps!

    Can't wait to see the progress, keep up the good work lbw1977!

  2. Back To Top    #2

    Join Date
    Jul 2014
    Location
    Nederland, TX
    Posts
    8

    Re: Intex Ultra Frame Inquiry

    While awaiting approval from the moderater on my initial question regarding lifts, I finally found an article on the term "lifts" for compacting material! Now my question is this: should the crusher run be compacted wet or dry, or does it matter? Thanks!

  3. Back To Top    #3
    Charlie_R's Avatar
    Join Date
    May 2013
    Location
    Mexico, MO
    Posts
    2,156

    Re: Intex Ultra Frame Inquiry

    Crusher run compacts best when damp.

    As you have found out (sorry I was unavailable when you asked), 3" lifts means you lay 3" of material, compact that, then repeat as needed to get to your finished height. If you want it really compacted, you do 1" lifts and run over it with a sheep's foot compactor. You can get 99% compaction that way. The smaller lifts allow for better compaction, but for your purposes, the 3" will do well enough.
    15'x48" 4500 gallon Intex pool, buried 1.5 ft. Pac-Fab Dynamo 3/4 hp pump. Hayward S180T sand filter, bought used. Taylor K-2006 test kit. Rocket mass heater based wood fired pool heater.

  4. Back To Top    #4
    pwrstrk's Avatar
    Join Date
    Aug 2012
    Location
    Elverson Pa.
    Posts
    4,758

    Intex Ultra Frame Inquiry

    Go with 3" inch lifts at the min. No more than 4". One inch lifts is a waste of time. You won't get any better compaction with one inch lifts. The reason being is when you compact the first one inch and then put on another one inch, that lift will disturb the lift under it. Go with the 3 inch.
    Are you using a plate compactor ? How much total do you have to raise this area ?
    I raised the low end for my pool using crush n run 4ft. 55 tons of it. Pool is dead level. Things like this a very doable you just HAVE to know what your doing. I work in the construction industry. I do these sort of things everyday. Any questions ask away. 😎
    Jeff
    24'x54" AG Morada RTR (by wilbar) 13'500 gal. Hayward Powerflo Matrix 1hp 2 speed. Hayward Perflex EC65 DE filter.

  5. Back To Top    #5
    Casey's Avatar
    Join Date
    Apr 2007
    Location
    SW PA
    Posts
    10,157

    Re: Explain how to compact crusher in 3" lifts

    I see you received the answers you were looking for. Sorry I wasn't available earlier. Good luck!
    I'd bet you my bikini you'll never get TFP water from a pool store!

    24' Sharkline Venture De Filter

  6. Back To Top    #6

    Join Date
    Jul 2014
    Location
    Nederland, TX
    Posts
    8

    Re: Intex Ultra Frame Inquiry

    Charlie_R thanks for the quick answer on damp compacting!

    pwrstrk, i probably don't 'need' to raise it any at all (certainly not 4 ft! very impressive!) I'm about 8" off level on an 18' run. I was planning to remove sod, grab a shovel and get to diggin'! I figured i'd simply dig down the high side to level it out. Live in Southeast Texas and the soil is mostly silt and clay and seems to be pretty stable (from what i know, which isn't much!).
    I was then thinking of building a frame or border using (4) 16 ft 4x4s. Add 3.5" of crusher run material to this "frame" on the ground just to ensure a more stable foundation (with the added benefit of maybe keeping grass/weeds from making their way through to my liner). The site is being prepped for a Round 15'x48" ProSeries metal frame AGP. Any glaring pitfalls that this newbie is missing?

    Quote Originally Posted by pwrstrk View Post
    Go with 3" inch lifts at the min. No more than 4". One inch lifts is a waste of time. You won't get any better compaction with one inch lifts. The reason being is when you compact the first one inch and then put on another one inch, that lift will disturb the lift under it. Go with the 3 inch.
    Are you using a plate compactor ? How much total do you have to raise this area ?
    I raised the low end for my pool using crush n run 4ft. 55 tons of it. Pool is dead level. Things like this a very doable you just HAVE to know what your doing. I work in the construction industry. I do these sort of things everyday. Any questions ask away. ��

  7. Back To Top    #7
    pwrstrk's Avatar
    Join Date
    Aug 2012
    Location
    Elverson Pa.
    Posts
    4,758

    Re: Explain how to compact crusher in 3" lifts

    Sounds good to me. Are you planning on "staking" the 4X4's to the ground so they don't move ?
    Jeff
    24'x54" AG Morada RTR (by wilbar) 13'500 gal. Hayward Powerflo Matrix 1hp 2 speed. Hayward Perflex EC65 DE filter.

  8. Back To Top    #8

    Join Date
    Jul 2014
    Location
    Nederland, TX
    Posts
    8

    Re: Explain how to compact crusher in 3" lifts

    Yes, planning on staking the treated 4x4s to the ground.
    Don't really need them, just thought it would look better and be easier to tie into our landscaping if it had a clean edge and was raised a bit. Mostly aesthetic.


    Quote Originally Posted by pwrstrk View Post
    Sounds good to me. Are you planning on "staking" the 4X4's to the ground so they don't move ?

  9. Back To Top    #9
    pwrstrk's Avatar
    Join Date
    Aug 2012
    Location
    Elverson Pa.
    Posts
    4,758

    Re: Explain how to compact crusher in 3" lifts

    Plus it will hold your stone in place from washing away from rain or what not. 😎
    Jeff
    24'x54" AG Morada RTR (by wilbar) 13'500 gal. Hayward Powerflo Matrix 1hp 2 speed. Hayward Perflex EC65 DE filter.

  10. Back To Top    #10
    mac.dblues's Avatar
    Join Date
    Jul 2013
    Location
    Arkadelphia, AR
    Posts
    321

    Re: Explain how to compact crusher in 3" lifts

    You can look at my build for the framing. There is a link in my signature. I used two layers of landscape timbers to retain my sand and finalize my leveling. I used 12" bridge spikes to stake the first run down and 3/8 x 4 1/2" lag bolts to tie the second run to the first.
    Mac.Dblues and ProfessorDaisy's Lower Arkansas Pool Install
    Intex UltraFrame 20ft x 52in deep, 9,400 Gallons / Approx 78,500 lbs, Intex 1600 GPH, 14" sand filter, Hayward Dyna-Skim SP1091LX, Taylor K-2006, SpeedStir, Sample Sizer
    First Fill May 2014, Deck finished June 2014, Mods happening probably on a continuous basis. Stay tuned.....

  11. Back To Top    #11

    Join Date
    Jul 2014
    Location
    Nederland, TX
    Posts
    8

    Re: Explain how to compact crusher in 3" lifts

    Mac, just finished reading your framing thread.
    Excellent work! Exactly what i pictured for mine (just square instead of octo); will definitely be stealing your idea and methods. Curious, when you say 'roofing material', is that just standard rolls of Felt or Synthetic roofing underlayment? Also, why the first layer of sand under the roofing material? why not just lay the roofing down on the semi-leveled ground and then the two dumps of sand tamped and leveled on top?

    Quote Originally Posted by mac.dblues View Post
    You can look at my build for the framing. There is a link in my signature. I used two layers of landscape timbers to retain my sand and finalize my leveling. I used 12" bridge spikes to stake the first run down and 3/8 x 4 1/2" lag bolts to tie the second run to the first.

  12. Back To Top    #12
    mac.dblues's Avatar
    Join Date
    Jul 2013
    Location
    Arkadelphia, AR
    Posts
    321

    Re: Explain how to compact crusher in 3" lifts

    Thanks. We're pretty proud of it. Too bad we have barely been able to enjoy it because of this crazy weather.

    We have a roofing company in town that makes rolls of asphalt roofing for buildings. They allow each of their employees to take home two pallets of seconds once a year and I work with a guy who's wife works there. They gave me one of their pallets. It's the really thick stuff, basically rolls of shingles, not the felt. My ground is red clay and was still about 3" out of level inside the frame so I put the first layer down to level it more in the low spots before putting down the roofing. I felt having the roofing separating some of the sand would keep the sand from shifting out from under the pavers after it dried out and had the weight of the pool pushing down on them.
    Mac.Dblues and ProfessorDaisy's Lower Arkansas Pool Install
    Intex UltraFrame 20ft x 52in deep, 9,400 Gallons / Approx 78,500 lbs, Intex 1600 GPH, 14" sand filter, Hayward Dyna-Skim SP1091LX, Taylor K-2006, SpeedStir, Sample Sizer
    First Fill May 2014, Deck finished June 2014, Mods happening probably on a continuous basis. Stay tuned.....