Intelli pH install

May 6, 2013
4
Quick question for everyone who has experience with this unit.
I know that the literature recommends installing the feed tube before the companion Intellichlor SWCG.
This is the exact location of the booster pump's cleaner line, making it a very cramped install. Would it be improper to instead install the dispensing tube before the
cleaner line?

Thanks in advance for your input !
 
Welcome to TFP!

You don't want the acid injection before the cleaner branches off. That would subject the cleaner to low PH, which isn't a great idea.

If there is absolutely no way to get it in-between the cleaner and the SWG, I would install it after the SWG.
 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.