    Is this Customary? Haul away too much dirt now charge to have it replaced?

    My PB dug our hole in April. The PB has finally gotten around to completing the pool (almost there). He now indicates that I need 40 yards of dirt to regrade property. Here's the catch. I have plenty of space and my yard is level. He hauled away too much dirt in the first place and now wants to charge me to have it replaced (i.e., $2000 for topsoil or $600 for 40 yards of dirt and stone).

    Is this customary? Never mentioned up front.

  2. Back To Top    #2
    dumbcluck's Avatar
    Join Date
    Aug 2013
    Location
    long beach
    Posts
    670

    Re: Is this Customary? Haul away too much dirt now charge to have it replaced?

    customarily lame.
    without even knowing the size of your pool, I can safely say that he easily hauled away more than 40 yards of dirt and you can bet he charged you for that too. unless there was some issue with the soil that was dug up, he is either not very bright or just doesn't care because youre the one paying for it. is it in your contract for these charges? if its already there, lesson learned. if he is adding it on, pretty lame, sounds like his mistake to me. again, check out your contract first before confronting him. (and remember he is still not done) I would hold back on final payment until he is completely finished and can explain himself in this matter.
    hope this helps. find out why first before getting angry though. he may have a perfectly logical reason.
    -Jimbo- My pool was full of dirt and trees. Now it's full of water and children!
    20k gallon inground pool, 18" raised spa 7' round, 8 jets, 3" spa plumbing. Pentair intelliflo 3hp vsp, Easy touch 4 w/ ic 40, CCP 420 cartridge filter, Raypak 407a w/ cupro nickel, Screen logic 2, Pentair intelliph, spa side remote, Pentair 5g color lights pool and spa, TF-100 test kit with speed stir and Dolphin Oasis Z5

  3. Back To Top    #3
    jjwalker's Avatar
    Join Date
    Aug 2012
    Location
    S. Louisiana
    Posts
    198

    Re: Is this Customary? Haul away too much dirt now charge to have it replaced?

    does his bro-in-law own the hauling company?
    18x36 vinyl / sport pool 5.5' deep / 1.5hp Tri-Star 2spd / Hayward c3030 325 sqft cartridge / ~15k gal / TF100

  4. Back To Top    #4

    Join Date
    Jul 2009
    Location
    Gonzales, La
    Posts
    220

    Re: Is this Customary? Haul away too much dirt now charge to have it replaced?

    40 yards of top soil is about $600-700 not $2000+. I'd tell him to go get 40 yards of the dirt he took away and probably got paid for twice already. Once by you and once by the person that recieved your dirt.
    15x36 Gunite w/Diamond Brite(Bahama Breeze plaster), 3.5-6', Pentair Easytouch Automation panel, Pentair 3HP VS pump, Pentair CNC 420 filter, Pentair 5G color changing light, Polaris 360 cleaner w/booster, Pentair IC-20 SWG
    My pool build
    http://www.troublefreepool.com/threa...ales-Louisiana

  5. Back To Top    #5

    In the Industry

    duraleigh's Avatar
    Join Date
    Apr 2007
    Location
    Sebring, Florida
    Posts
    30,083

    Re: Is this Customary? Haul away too much dirt now charge to have it replaced?

    Having that much mistrust of your PB to finish your build in a fair and professional manner would worry me a lot.

    Do you have financial leverage?
    Dave S.
    42k vinyl and concrete pool, 1.5hp pump, 140gpm filter
    TFTestkits , PoolMath , Pool School

  6. Back To Top    #6

    Join Date
    Apr 2013
    Location
    Sacramento, CA
    Posts
    2,769

    Re: Is this Customary? Haul away too much dirt now charge to have it replaced?

    Why does he need 40 yards? Is your pool gunite or liner? How much do you still owe?

    When my pool was built I had them scrape my yard and had to add 30 yards back. But I knew that going in.

    He should have understood he needed additional dirt and it should be in his price.
    22k gallon IG pebblefina, Jandy 1.5 HP VS, Jandy CV Cartridge filter, Fafco solar panels, Polaris 360 supply side cleaner, waterfall

  7. Back To Top    #7

    Join Date
    Feb 2014
    Location
    Jersey side of Philadelphia
    Posts
    93

    Re: Is this Customary? Haul away too much dirt now charge to have it replaced?

    Thanks for your opinions

    He never mentioned at the outset

    I think he screwed up amd took away too much dirt. We have a 750 (at least that is what we contracted for) sf pool with 8 ft deep end for diving board. frankly it is free form and I don't think it is 750 sf-- might be but seems smaller.

    He just finished plastering today making the pool substantially complete 16 days after the contract called for it.

    We were surprised with the additional up charge for diamond bright midnight blue plaster (never said the darker colors would be more when we initially contracted for the diamond bright upgrade of $2000). A few weeks ago he hits us up for another $1375 bc he claims midnight blue is more expensive.

    THe pool, fence, pavers, hot tub, etc all through him totals $75k and considering he promised a finish date by 6/1, then essentially guaranteed 6/23 and now it looks like it will be 7/2 with everything complete, we are put off by his penny pinching.

    Because he was so late we asked for two free pillars for free. He agreed though I believe he mentioned that the paver company gives him two pillars per 500 sf of patio and we have 1100 sf.

    We still owe him about $11k with $5k due today but I came home after plastering.

    That is the story

  8. Back To Top    #8

    Re: Is this Customary? Haul away too much dirt now charge to have it replaced?

    Regardless both of his prices for topsoil or rocks/dirt are way too high.
    18' x 36' saltwater inground vinyl pool

  9. Back To Top    #9
    jjwalker's Avatar
    Join Date
    Aug 2012
    Location
    S. Louisiana
    Posts
    198

    Re: Is this Customary? Haul away too much dirt now charge to have it replaced?

    Quote Originally Posted by Species 8472 View Post
    I have plenty of space and my yard is level.

    seriously, if you are happy with the grading why continue to do work to the yard? are you laying sod or seeding after the work is done. The only REAL reason to put down good topsoil is to prep it for sod or seed. If that's the case it needs to be graded to a level that will accept the inch or so of sod. Really hard to give advice if you don't have pics. bottom line, if you're happy with the grading leave it alone, if not tell him you'll provide your own topsoil, he provides the labor.
    18x36 vinyl / sport pool 5.5' deep / 1.5hp Tri-Star 2spd / Hayward c3030 325 sqft cartridge / ~15k gal / TF100

  10. Back To Top    #10

    Join Date
    Jul 2009
    Location
    Gonzales, La
    Posts
    220

    Re: Is this Customary? Haul away too much dirt now charge to have it replaced?

    Quote Originally Posted by Species 8472 View Post
    Thanks for your opinions

    He never mentioned at the outset

    I think he screwed up amd took away too much dirt. We have a 750 (at least that is what we contracted for) sf pool with 8 ft deep end for diving board. frankly it is free form and I don't think it is 750 sf-- might be but seems smaller.

    He just finished plastering today making the pool substantially complete 16 days after the contract called for it.

    We were surprised with the additional up charge for diamond bright midnight blue plaster (never said the darker colors would be more when we initially contracted for the diamond bright upgrade of $2000). A few weeks ago he hits us up for another $1375 bc he claims midnight blue is more expensive.

    THe pool, fence, pavers, hot tub, etc all through him totals $75k and considering he promised a finish date by 6/1, then essentially guaranteed 6/23 and now it looks like it will be 7/2 with everything complete, we are put off by his penny pinching.

    Because he was so late we asked for two free pillars for free. He agreed though I believe he mentioned that the paver company gives him two pillars per 500 sf of patio and we have 1100 sf.

    We still owe him about $11k with $5k due today but I came home after plastering.

    That is the story
    Does your contract state "diamond bright midnight blue plaster " and a price? If it does then do not pay him the extra!! Hold out $$$ till you get you pool and yard like you want it. I'm guessing there was no penalty in the contract if he was over the time limit to finish the work?
    15x36 Gunite w/Diamond Brite(Bahama Breeze plaster), 3.5-6', Pentair Easytouch Automation panel, Pentair 3HP VS pump, Pentair CNC 420 filter, Pentair 5G color changing light, Polaris 360 cleaner w/booster, Pentair IC-20 SWG
    My pool build
    http://www.troublefreepool.com/threa...ales-Louisiana

  11. Back To Top    #11

    Join Date
    Feb 2014
    Location
    Jersey side of Philadelphia
    Posts
    93

    Re: Is this Customary? Haul away too much dirt now charge to have it replaced?

    Quote Originally Posted by jjwalker View Post
    seriously, if you are happy with the grading why continue to do work to the yard? are you laying sod or seeding after the work is done. The only REAL reason to put down good topsoil is to prep it for sod or seed. If that's the case it needs to be graded to a level that will accept the inch or so of sod. Really hard to give advice if you don't have pics. bottom line, if you're happy with the grading leave it alone, if not tell him you'll provide your own topsoil, he provides the labor.
    No. The yard was completely level previously. Now, it slopes away from the pool.

    - - - Updated - - -

    Quote Originally Posted by 36racin View Post
    Does your contract state "diamond bright midnight blue plaster " and a price? If it does then do not pay him the extra!! Hold out $$$ till you get you pool and yard like you want it. I'm guessing there was no penalty in the contract if he was over the time limit to finish the work?
    It just said "Diamond bright plaster" and we were charged $2000. When we asked for midnight blue he indicated the darker colors were more expensive. I get this fact. However, this was just an example of throwing on this charge. I told him we would likely go with the darker plaster, but the onus was on us to specify.

    However, I am not going to pay for dirt that he took away from our property to be, in essence, returned to our property. If someone feels differently then let me know. Most of the opinions have been that we would be crazy to do so.

  12. Back To Top    #12
    Patrick_B's Avatar
    Join Date
    Jun 2011
    Location
    Midland TX
    Posts
    15,001

    Re: Is this Customary? Haul away too much dirt now charge to have it replaced?

    No, I would not do that either, and I think it was wrong of him to do that. I would use financial leverage as was mentioned above by duraleigh.

    It sounds unscrupulous to me on the dirt issue, but he is right on the darker blue finishes. All of them are much, much higher in cost per bag.
    TFP Moderator
    Essential Links:
    ABC's Of Pool Chemistry, Test Kits, SLAM Your Pool
    28K Gal IG FreeForm, CLI Quartz, Pentair 36"SF & VS Pump, Dolphin M5, Rheem

  13. Back To Top    #13

    Join Date
    Apr 2014
    Location
    Stony Brook, NY
    Posts
    157

    Re: Is this Customary? Haul away too much dirt now charge to have it replaced?

    He should have just left the dirt. If he needed it taken away, he could have done so at the end of the job. Sounds like his screwup, but you have to pay for it. Ridiculous!

  14. Back To Top    #14

    Join Date
    Feb 2014
    Location
    Jersey side of Philadelphia
    Posts
    93

    Re: Is this Customary? Haul away too much dirt now charge to have it replaced?

    Quote Originally Posted by Brushpup View Post
    No, I would not do that either, and I think it was wrong of him to do that. I would use financial leverage as was mentioned above by duraleigh.

    It sounds unscrupulous to me on the dirt issue, but he is right on the darker blue finishes. All of them are much, much higher in cost per bag.
    Thanks for the advice. I spoke to him and he is going to bring in some dirt. Who knows if he will attempt to pay.

    - - - Updated - - -

    Quote Originally Posted by suzook View Post
    He should have just left the dirt. If he needed it taken away, he could have done so at the end of the job. Sounds like his screwup, but you have to pay for it. Ridiculous!
    Quote Originally Posted by Species 8472 View Post
    Thanks for the advice. I spoke to him and he is going to bring in some dirt. Who knows if he will attempt to pay.
    Attempts to charge, that is.

    Quote Originally Posted by Brushpup View Post
    No, I would not do that either, and I think it was wrong of him to do that. I would use financial leverage as was mentioned above by duraleigh.

    It sounds unscrupulous to me on the dirt issue, but he is right on the darker blue finishes. All of them are much, much higher in cost per bag.
    Quote Originally Posted by Species 8472 View Post
    No. The yard was completely level previously. Now, it slopes away from the pool.

    - - - Updated - - -



    It just said "Diamond bright plaster" and we were charged $2000. When we asked for midnight blue he indicated the darker colors were more expensive. I get this fact. However, this was just an example of throwing on this charge. I told him we would likely go with the darker plaster, but the onus was on us to specify.

    However, I am not going to pay for dirt that he took away from our property to be, in essence, returned to our property. If someone feels differently then let me know. Most of the opinions have been that we would be crazy to do so.
    Quote Originally Posted by 36racin View Post
    Does your contract state "diamond bright midnight blue plaster " and a price? If it does then do not pay him the extra!! Hold out $$$ till you get you pool and yard like you want it. I'm guessing there was no penalty in the contract if he was over the time limit to finish the work?
    Quote Originally Posted by jjwalker View Post
    seriously, if you are happy with the grading why continue to do work to the yard? are you laying sod or seeding after the work is done. The only REAL reason to put down good topsoil is to prep it for sod or seed. If that's the case it needs to be graded to a level that will accept the inch or so of sod. Really hard to give advice if you don't have pics. bottom line, if you're happy with the grading leave it alone, if not tell him you'll provide your own topsoil, he provides the labor.
    Quote Originally Posted by ouachita View Post
    Regardless both of his prices for topsoil or rocks/dirt are way too high.
    Quote Originally Posted by Species 8472 View Post
    Thanks for your opinions

    He never mentioned at the outset

    I think he screwed up amd took away too much dirt. We have a 750 (at least that is what we contracted for) sf pool with 8 ft deep end for diving board. frankly it is free form and I don't think it is 750 sf-- might be but seems smaller.

    He just finished plastering today making the pool substantially complete 16 days after the contract called for it.

    We were surprised with the additional up charge for diamond bright midnight blue plaster (never said the darker colors would be more when we initially contracted for the diamond bright upgrade of $2000). A few weeks ago he hits us up for another $1375 bc he claims midnight blue is more expensive.

    THe pool, fence, pavers, hot tub, etc all through him totals $75k and considering he promised a finish date by 6/1, then essentially guaranteed 6/23 and now it looks like it will be 7/2 with everything complete, we are put off by his penny pinching.

    Because he was so late we asked for two free pillars for free. He agreed though I believe he mentioned that the paver company gives him two pillars per 500 sf of patio and we have 1100 sf.

    We still owe him about $11k with $5k due today but I came home after plastering.

    That is the story
    Quote Originally Posted by gwegan View Post
    Why does he need 40 yards? Is your pool gunite or liner? How much do you still owe?

    When my pool was built I had them scrape my yard and had to add 30 yards back. But I knew that going in.

    He should have understood he needed additional dirt and it should be in his price.
    Quote Originally Posted by duraleigh View Post
    Having that much mistrust of your PB to finish your build in a fair and professional manner would worry me a lot.

    Do you have financial leverage?
    Quote Originally Posted by 36racin View Post
    40 yards of top soil is about $600-700 not $2000+. I'd tell him to go get 40 yards of the dirt he took away and probably got paid for twice already. Once by you and once by the person that recieved your dirt.
    Quote Originally Posted by jjwalker View Post
    does his bro-in-law own the hauling company?
    Quote Originally Posted by dumbcluck View Post
    customarily lame.
    without even knowing the size of your pool, I can safely say that he easily hauled away more than 40 yards of dirt and you can bet he charged you for that too. unless there was some issue with the soil that was dug up, he is either not very bright or just doesn't care because youre the one paying for it. is it in your contract for these charges? if its already there, lesson learned. if he is adding it on, pretty lame, sounds like his mistake to me. again, check out your contract first before confronting him. (and remember he is still not done) I would hold back on final payment until he is completely finished and can explain himself in this matter.
    hope this helps. find out why first before getting angry though. he may have a perfectly logical reason.
    Quote Originally Posted by Species 8472 View Post
    My PB dug our hole in April. The PB has finally gotten around to completing the pool (almost there). He now indicates that I need 40 yards of dirt to regrade property. Here's the catch. I have plenty of space and my yard is level. He hauled away too much dirt in the first place and now wants to charge me to have it replaced (i.e., $2000 for topsoil or $600 for 40 yards of dirt and stone).

    Is this customary? Never mentioned up front.

  15. Back To Top    #15

    Join Date
    May 2014
    Location
    East Texas
    Posts
    33

    Re: Is this Customary? Haul away too much dirt now charge to have it replaced?

    The same thing just happened to me. The pool builder left some dirt from the excavation, but not enough and ended up having to bring in 2 loads for the decking. I've been up front with them about my budget, so when I asked about the cost they immediately said there was no charge to me - it was their responsibility, they should have left more. I don't know if they got it from another excavation, or had to pull in a favor - but I'm glad they owned up and that they didn't ask me to pay.

  16. Back To Top    #16

    Join Date
    Feb 2014
    Location
    Jersey side of Philadelphia
    Posts
    93

    Re: Is this Customary? Haul away too much dirt now charge to have it replaced?

    Quote Originally Posted by tylerlisal View Post
    The same thing just happened to me. The pool builder left some dirt from the excavation, but not enough and ended up having to bring in 2 loads for the decking. I've been up front with them about my budget, so when I asked about the cost they immediately said there was no charge to me - it was their responsibility, they should have left more. I don't know if they got it from another excavation, or had to pull in a favor - but I'm glad they owned up and that they didn't ask me to pay.
    Sounds like a good company--owning up to their mistakes.