Hi all! Last week I purchased an 18x48 Intex Metal Pool thinking ok this is going to be a breeze to install. Wow was I wrong!!! I'm new to this site & have gotten lots of useful information as far as preparing my site to be level. The ground work alone has taken us a week & it's still a work in progress. I purchased today a Gorilla Pad to go under the pool to help protect the liner. My question is with me putting down the Gorilla Pad do I still need to put down sand? Any advice would be greatly appreciated :D
 
Welcome to TFP!

The surface under the gorilla pad should be quite flat and level. The usual way to do that is to get reasonably close to level and then put down a layer of sand to get out the final imperfections. If your existing surface is smooth and level there is no need for sand.
 