A month ago my above ground pool (buried 2') was installed and filled. I needed time for my backyard soil to settle so I can pour concrete and that is happening this week, so next week I can focus on my pool. Right now, since so much time has passed, my water is full of algae (very Green). I also have my TF-100 test kit on the way to my house.
My first step is to install the pool pump and remove all leaves/branches floating on top.
After that I am confused on what to do, should I introduce CYA in the green water then start the SLAMing process with liquid bleach? Or should I start with liquid bleach to try to remove some of the algae first?
My first step is to install the pool pump and remove all leaves/branches floating on top.
After that I am confused on what to do, should I introduce CYA in the green water then start the SLAMing process with liquid bleach? Or should I start with liquid bleach to try to remove some of the algae first?