Ok so I'm having electrical done next week and I wanted to stub out something so I could do some landscape lighting behind the pool at a later date. Figure I should do it now since ground is already dug up.
I was thinking maybe I could purchase the Jandy Landscaping LEDs and run off the remote control
1. What exactly do I need to do this? Stub out electrical outlet behind pool? Conduit?
2. Should I do this now or later?
3. What is a ball park figure to do this ?it would be about a 35ft run from equipment pad to behind pool.
Thanks all any help/opinions are greatly appreciated
Sent from my SGH-T989 using Tapatalk 2
I was thinking maybe I could purchase the Jandy Landscaping LEDs and run off the remote control
1. What exactly do I need to do this? Stub out electrical outlet behind pool? Conduit?
2. Should I do this now or later?
3. What is a ball park figure to do this ?it would be about a 35ft run from equipment pad to behind pool.
Thanks all any help/opinions are greatly appreciated
Sent from my SGH-T989 using Tapatalk 2