Equipment pad build, all opinons welcome.

Apr 13, 2013
40
Amarillo, Tx
I am in process of building equipment pad,& manifold. I was thinking about extending skimmer pipe's over to the returns and T them together with 1/2" ballvalve and reducers from 1 1/2" pipe. So when winterizing or needing to work on pipes, i could pull water from all pipes to waste. Take eyeballs out screw in an L above water line and poof. What ya'll think ?
 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.