This site looks really awesome and I am trying to read as much as I can, but please be patient with me :-D
Just put up a new AG pool. Readings from this morning:
FC 6.5
CC .5
Ph 7.5
TA 80
CH 110
CYA 0
These readings were after adding bleach, and then adding stabilizer. My CYA has remained at 0. Pool is clear, and has been since filled a few days ago. I will get a lot of sun on the pool (when it decides to shine in Wisconsin.)
I am familiar with the pool calculator, but am confused at what order or timeframe to add things?
Also, I would like to keep the solar cover on as much as possible to heat the pool, but I assume that I should remove it while adding chemicals and for a time after? And is it good to leave the cover on most of the time, in general?
Lastly, will be leaving town for 3-4 days tomorrow and concerned about what I may return to.
Thanks in advance for any help this rookie may receive!
Just put up a new AG pool. Readings from this morning:
FC 6.5
CC .5
Ph 7.5
TA 80
CH 110
CYA 0
These readings were after adding bleach, and then adding stabilizer. My CYA has remained at 0. Pool is clear, and has been since filled a few days ago. I will get a lot of sun on the pool (when it decides to shine in Wisconsin.)
I am familiar with the pool calculator, but am confused at what order or timeframe to add things?
Also, I would like to keep the solar cover on as much as possible to heat the pool, but I assume that I should remove it while adding chemicals and for a time after? And is it good to leave the cover on most of the time, in general?
Lastly, will be leaving town for 3-4 days tomorrow and concerned about what I may return to.
Thanks in advance for any help this rookie may receive!