Should the light niche be installed before pouring the collar? And should the concrete come up around the bottom of the niche? My niche bottom is only 8 inches off the ground, so if I pour the suggested 10-12 inches it will be 2-4 into the niche.
duraleigh said:Not much info here to respond to. Are you building this pool? Do you have a PB?
swimcmp said:I would recommend not having the niche bedded in the bond beam concrete