They just finished the construction of my pool last weekend, with a fresh fill from the hose. It is a pebble finish, so they acid washed on the second day before the fill. After the fill, they added two gallons of Acid and told me to run the pumps twice a day, and to brush three times a day. On Wednesday I added soda ash to bring the PH back in check, since it was very low. On Friday, I was told to add two gallons of Chlorine, and to wait until Monday when the PB sends over his tech to help me to balance the water and to go over all the pool functions.
Today, I ran the first series of tests with my TF-100 kit and speed stir. What I basically need to know is, what should I do for the next few weeks, while I wait for the plaster cures, so I can start my SWCG.
PH = 7.6
FC = 11ppm
CC = 0
TC = 11ppm
TA = 60
CH = 270
CYA = 0
I've only used Soda Ash, Liquid Chlorine and Muriatic Acid. I have a large tub of conditioner for CYA
Today, I ran the first series of tests with my TF-100 kit and speed stir. What I basically need to know is, what should I do for the next few weeks, while I wait for the plaster cures, so I can start my SWCG.
PH = 7.6
FC = 11ppm
CC = 0
TC = 11ppm
TA = 60
CH = 270
CYA = 0
I've only used Soda Ash, Liquid Chlorine and Muriatic Acid. I have a large tub of conditioner for CYA