Putting in a new stamped concrete deck for the barbecue, fire pit and more seating area. I'm in the process of getting the utilites plumbed where the slab will be. I'm running a 2" gas line under that will be connected to the house at a later date, this will allow the addition of a pool heater if I choose. The line will also "T" off and supply the barbecue and fire pit. This is the area approx 1 year ago.
 

Attachments

  • pool cover, fog, trimmed tree\'s, 5-30-6-7 019 (Large).jpg
    pool cover, fog, trimmed tree\'s, 5-30-6-7 019 (Large).jpg
    171.2 KB · Views: 347
  • pool 3-16 thru 4-4 077 (Large).jpg
    pool 3-16 thru 4-4 077 (Large).jpg
    327.9 KB · Views: 347
I dug most of the dirt out with the tractor to get a somewhat level pad then dug the trenches for the electrical / gas with a shovel.
 

Attachments

  • new patio const and speaker covers 12-14-12 005 (Large) (2).jpg
    new patio const and speaker covers 12-14-12 005 (Large) (2).jpg
    335.3 KB · Views: 340
  • new patio water lines 11-25-12 003 (Large).jpg
    new patio water lines 11-25-12 003 (Large).jpg
    156.6 KB · Views: 340
Gas will go in tomorrow. here's what it looks like now. Not very impressive at this point. Also here is a pic of some speaker covers we made to prevent them from being stolen / messed with since the pool is approx 150' from the house and we live on a country road.
 

Attachments

  • new patio electrical 12-20-12 003 (Large).jpg
    new patio electrical 12-20-12 003 (Large).jpg
    420.4 KB · Views: 278
  • new patio const and speaker covers 12-14-12 009 (Large).jpg
    new patio const and speaker covers 12-14-12 009 (Large).jpg
    280.7 KB · Views: 278
Gas lines in, Waiting on the pressure test to fill in the trenches, hopefully Saturday. once the forms for the deck are in place they will make the stubbed out lines through the deck the correct length and reduce them to 3/4". I guess that is enough for a fire-pit or barbecue.
 

Attachments

  • new patio gas lines 1-3-13 008 (Large).jpg
    new patio gas lines 1-3-13 008 (Large).jpg
    413.2 KB · Views: 259
  • new patio gas lines 1-3-13 009 (Large).jpg
    new patio gas lines 1-3-13 009 (Large).jpg
    390.7 KB · Views: 259
Here is an update, patio poured, retaining wall done.
 

Attachments

  • new patio 1-7-13 005 (Large).jpg
    new patio 1-7-13 005 (Large).jpg
    274.4 KB · Views: 200
  • new patio concrete forms 2-21-13 048 (Large).jpg
    new patio concrete forms 2-21-13 048 (Large).jpg
    278.8 KB · Views: 200
  • new patio ret wall stucco 2-26-13 065 (Large).jpg
    new patio ret wall stucco 2-26-13 065 (Large).jpg
    278.9 KB · Views: 200
bobby1017 said:
Gas lines in, Waiting on the pressure test to fill in the trenches, hopefully Saturday. once the forms for the deck are in place they will make the stubbed out lines through the deck the correct length and reduce them to 3/4". I guess that is enough for a fire-pit or barbecue.

Did you install the gas PE lines yourself? When I had to replace our line, I thought about doing it myself, but couldn't find needed materials for this. I ended up having some plumbers do it, and they used a long coil of 1 1/2" PE for the 125' run to the pool equipment pad. They used a plate welder to weld the PE pipe fittings and risers to the PE itself. Did you add a tracer wire?
 

Enjoying this content?

Support TFP with a donation.

Give Support
The lines under the deck are 2" steel gas pipe that has the yellow plastic coating, you then wrap any of the fittings with this special 10 mil tape so they are protected also.
The main supply from the house will be the plastic line you are talking about so there will need to be a tracer wire attached to it. There will only be two fittings required, one being the riser by the gas meter, the other a coupling that will attach to the 2" steel gas pipe. from what the supplier told me these are "friction" fitting that all you do is push them on to the end of the plastic and some kind of O-ring will seal it. Seems strange to me but I guess since the pressure is so low it works. The fittings are made of steel. The material to run 170' of the 2" plastic are approx $450.00, digging the ditch 18" deep min will be the hard part, at least we have fairly soft earth.
 
Things are slowly coming together, got the barbeque moved to the patio this saturday, I was able to make some fork extensions that will clip to the bucket of my tractor. Using a front loader as a forklift is harder than you might think as the hydraulics don't work as smooth as a forklift's would, plus driving down a dirt road is a lot rougher than it looks, when I got to the deck it was "leaning" supported by a couple ropes I had tied to the bucket, they were 3/4" nylon and they were stretched tight. Fortunately I was able to get some blocks under it and it rocked back to level as I released the ropes. After that 4 people were able to do the final positioning. I'll get some pics here shortly. Next up is the nat gas line.
 
Here are a couple pic's of the new patio. All the brown river rock was a free-be on craigslist, I had all that in the back of my p/u, I think it was a bit overloaded.
 

Attachments

  • new patio barbque, stero cab, pool pics 5-27-13 001 (Large).jpg
    new patio barbque, stero cab, pool pics 5-27-13 001 (Large).jpg
    271.1 KB · Views: 64
  • new patio barbque, stero cab, pool pics 5-27-13 014 (Large).jpg
    new patio barbque, stero cab, pool pics 5-27-13 014 (Large).jpg
    314.2 KB · Views: 64
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.