Concrete Step?

Sep 5, 2012
48
Oklahoma
So they finished the rebar and we noticed that the top step was missing. With our design there are 4 steps and the top step is at 0 because it is even with top of tiling as it is on the same side as our raised bond beam so the tile line/1st step is actually 12" down from the coping/decking. Link below with pictures for a better idea of what I am talking about.
new-pool-build-in-oklahoma-t53032.html

The problem is the top step is missing. There is no rebar or earth forming it. So now it looks like we have a 3ft drop to the 1st step. We called PB who said that the top step would be formed from concrete as it will be exposed to the elements and gunite would not work well. My questions are:

1. Will the concrete adhere to the gunite sufficiently?
2. Will the concrete hold up to being exposed to the water (ozone system)?
3. Don't they still need to rebar the concrete step?
 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.