I'm new to all this - and did search first. Our pool co got the pool going while I was out of town but we're days from having pool school (turnover). A tech came to do something and the pool quit running (labor day so no phone support). I tried going through the easytouch8 to find the schedule and there wasn't one. Went through the Intelliflo and there wasn't a schedule. I created one in the easytouch but it never ran the pump so I created a schedule in the vsd and its running fine.
My question is "should the scheduler in the panel be controlling the drive"? I'm an industrial controls guy and like having everything in one place. When we do poolschool on Wed is it unreasonable that I ask that we use the serial comms to the vsd and do all the control in Easytouch? Seems to be a no brainer to me.
Any idea on how to test comms to the vsd?
Many thanks!
My question is "should the scheduler in the panel be controlling the drive"? I'm an industrial controls guy and like having everything in one place. When we do poolschool on Wed is it unreasonable that I ask that we use the serial comms to the vsd and do all the control in Easytouch? Seems to be a no brainer to me.
Any idea on how to test comms to the vsd?
Many thanks!