I know another bonding thread. I have read all of them and have read all the code on this. I just want to put it out to make sure I have everything covered. I will be using a licensed electrician that is a friend of the family but I do not believe he is up to code on pool bonding as that is not his specialty.
I will start at the pump, filter , no heater , then go to light niche which as I understand meets code for bonding the water. Then bond the pool walls with a bonding lug attached to the steel wall through a bolt , next the aluminum coping with a lug but with SS washer on each side of the bonding lug. I will then go around pool hitting each piece of coping and in 4 equally spaced places on the wall. Also bond to rebar in the deck with lugs at 4 spots. I will have no ladders, diving boards or heaters.
Anything I am missing? Also does this have to be one continuous wire or can it be cut and attached with lugs. Like run one complete loop of wire around the pool and connect the ends with a lug. Then branch off and connect all others like above or does it have to be no cuts in the line?
Sent from my iPhone using Tapatalk
I will start at the pump, filter , no heater , then go to light niche which as I understand meets code for bonding the water. Then bond the pool walls with a bonding lug attached to the steel wall through a bolt , next the aluminum coping with a lug but with SS washer on each side of the bonding lug. I will then go around pool hitting each piece of coping and in 4 equally spaced places on the wall. Also bond to rebar in the deck with lugs at 4 spots. I will have no ladders, diving boards or heaters.
Anything I am missing? Also does this have to be one continuous wire or can it be cut and attached with lugs. Like run one complete loop of wire around the pool and connect the ends with a lug. Then branch off and connect all others like above or does it have to be no cuts in the line?
Sent from my iPhone using Tapatalk