Become a TFP Supporter Pool Math Forum Rules Pool School
Results 1 to 2 of 2

Thread: Feeling happy and kind of poor today

  1. Back To Top    #1

    Join Date
    Apr 2012
    Newton, NC

    Feeling happy and kind of poor today

    We signed the contract for our pool today.

    Other than the homes we have bought over the years, this is the largest single expenditure we have ever made.

    Major components are listed in my signature.

    Construction should start in about 4 weeks.
    Vince L

    16' x 37' fiberglass pool, 8' fiberglass spa, Hayward Swimclear C3030 filter, Hayward EcoStar VS pump, Goldline Pro Logic PL-PS-8, Goldline SWCG, Goldline Sense & Dispense pH control, Fiberstars LED's in pool & spa, AquaCal SQ175R heat pump, SR Smith Typhoon slide, Polaris 9300xi robotic cleaner, TF-100 Test Kit

  2. Back To Top    #2
    linen's Avatar
    Join Date
    Jul 2010
    Twin Cities, MN

    Re: Feeling kind of poor today

    Looking forward to your build, please share some pictures
    TFP Expert who uses Pool School and my TF100 test kit along with PoolMath for my: Round 11K gallon AGP with deep end, 20" sand filter, Matrix 1hp 2spd, 6 2ftX20ft solar panels (and solar cover!), Intex SWCG (copper bars disconnected) and a Rubadub hot tub (chlorine). The SLAM process is not finished until: 1. CC < 0.5 ppm, 2. An OCLT < 1.0 ppm and, 3. The water is crystal clear.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts