Re: Where do I start?m
Ok, I've read the pool school (several times). Had some delays getting the pool running. Pool will be topped off this morning. Only chemical added in past week was a couple of gallons of 6% chlorine to slow any growth until I got the pump running. I could not find Dichlor. On hand, I have:
-Pool Shock (from Costco): 1 pack per 12k gallon
-Muriatic Acid (liquid)
-Bleach (6%)
-Stabilizer (4ea, 3 lb containers)
-20 lbs DE powder (filter manual calls for it with new filter)
1-Pool Calc calls for 5 lbs of Stabilizer to raise to 30. I don't have a sock that big...
2-For first 4 days, should I use two packs each night of shock?
3-and at end of 4 days ????
4-when do I add salt?
5-when do I turn on Chlorinator?
Fiberglass/19,800 gal/ Pump VS3050(1000 rpm, 18 hr run time)/IC40 chlorinator/C&C Plus Cartridge Filter/EasyTouch