Become a TFP Supporter Pool Math Forum Rules Pool School
Results 1 to 2 of 2

Thread: when can I remove the shotcrete forms?

  1. Back To Top    #1

    Join Date
    Aug 2010
    Charleston, South Carolina

    when can I remove the shotcrete forms?

    I'm hoping to have my pool shot next week. Half of it is inground and about 4' of it is above ground. How long should I wait before I remove the plywood forms. 1 day, 2 days, longer???? Also is there a certain amount of time I should let the shotcrete cure before I install the waterline tiles?
    half Inground/half above ground, shotcrete pool, 19,000 gallons - KrystalKrete Krystal Blue quartz finish
    Pentair intelliflo variable speed pump - Pentair Easy Touch automation - Pentair T100 sand filter - Savi Melody LED lights - Mortex KoolDeck - Charleston, South Carolina

  2. Back To Top    #2

    In the Industry

    Join Date
    Feb 2012

    Re: when can I remove the shotcrete forms?

    You can pull the forms - 1-2 days after it is shot - water cure compete form and pool side - I would do a complete 7 day water cure including the beam - then install tile - coping etc
    (Remember no rebound should be used in the structure)
    check video Swimming pool section

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts