Liner is is and pool is full :lol: But now the rain has set in. I picked up the gas line supplies, $107 for 40' and 2 compresion fittings, sure beats the $300-$400 quote I got from the local Heating and cooling Companies. Electrical is to be inspected tommorrow, then grade can be finished and retainig wall can be installed as well. 45 tons of limestone wall material was delivered today. HUGE pieces, have decided to hire this out. I have had zero experiance with large slabs like this, and for the price I don't think it is worth my time, Pics to come....