What do the concrete guys pack around the back of the coping and in between a poured concrete deck to leave room for caulking later? It appears to leave about a 3/8"-1/2" gap that is cleared afterwards and then caulked.
Anybody know what it is called or where I can get some?
Thanks...
Anybody know what it is called or where I can get some?
Thanks...