Become a TFP Supporter Pool Math Forum Rules Pool School
Results 1 to 4 of 4

Thread: Almost finished...... but what the heck

  1. Back To Top    #1

    Almost finished...... but what the heck

    So last July we moved into our new house. We moved 10 houses down the street from our old house and doubled our lot size. We went from a 40x105 lot to a 77x179 lot.

    So we put the pool in late last year and closed it right away. Before diggining we were unaware that we had an almost 4' slope from front to back in the yard, so we had to add armor stone. The first of spring, I adjusted the grade, adding 45 yards of soil in the back half and 15 yards of potato stones. along the back of the shed for drainage.

    I did the sod myself, built a shed, and just finished landscaping two days ago. We added glass railing on porch, custom concrete work and just need a new BBQ and paint the shed.

    well without delay, here it is

    enclosed porch off of rear of house

  2. Back To Top    #2

    Re: Almost finished...... but what the heck

    Looks great!
    10,800 gallons Gunite/Plaster
    Hayward 244t 24" Sand Filter with Zeo
    1 1/2 HP Challenger
    Digital Pool Pilot DIG-220 SC-48
    Located in NOLA

  3. Back To Top    #3

    In the Industry
    duraleigh's Avatar
    Join Date
    Apr 2007
    Sebring, Florida

    Re: Almost finished...... but what the heck

    Nice!! Are those big rocks around the perimeter the "potato stones"?
    Dave S. - Forum owner
    42k vinyl and concrete pool, 1.5hp pump, 140gpm filter
    TFTestkits , PoolMath , Pool School

  4. Back To Top    #4

    Re: Almost finished...... but what the heck

    No the potato stone are behind the shed. The big ones are armor stone. They way a half ton to a ton each.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts