Hi guys. I had my 21' AGP installed. Its level and all but there was a 13" dropoff from high point to low point when excavating.
The excavator dug an additional 2 to 3 feet around the pool so its up to my townships code. So how exactly do I landscape this ? Do I fill it all in with plastic and rocks ? On one side the rocks will come about a foot up the pool wall. On the other side not so much. Is this normal ?
 