I just had my pool drained this week to replace the tile. The pool was drained on Monday and the old tile was removed. The new tile was installed today (Thursday), a light acid wash was done and I am now refilling the pool. I am filling from my garden hoses (2) using city water. I tested the water coming from the hose into the pool. Here are my results:
FC - 1.5 ppm
TC - 1.5 ppm
pH - 7.6
TA - 70
CH - 90
I calculate it will take about 40 hours to fill. I started filling at 2:30 PM today.
What do I need to be doing while the pool fills and what should I be adding?
FC - 1.5 ppm
TC - 1.5 ppm
pH - 7.6
TA - 70
CH - 90
I calculate it will take about 40 hours to fill. I started filling at 2:30 PM today.
What do I need to be doing while the pool fills and what should I be adding?