We we installed our pool, the PB sales person said our VS pump should raise our bill by only $20-35 a month.
Well our bill is $80-100 more a month. So I have thinking about bringing down the pump run time.
The pump runs 20hrs a day. 5 1/2hrs on high and the rest on low speed. The pool is 8k gallons and we have a pentane pump.
Could/should I bring down the pump time?
Thanks
Well our bill is $80-100 more a month. So I have thinking about bringing down the pump run time.
The pump runs 20hrs a day. 5 1/2hrs on high and the rest on low speed. The pool is 8k gallons and we have a pentane pump.
Could/should I bring down the pump time?
Thanks