Hello,
I'm in the process of assembling my pool system, and and going to use the BBB method, but wanted a continuous dosing of the bleech as to consistantly maintain the FC level rather than have the swings from too much to too little, I know I will still need to adjust for weather and bather load, but figure it will still be minimal.
Anyways, I have aquired an LMI P121-158 dosing pump for cheap, but it didn't come with the foot valve or the 4FV (priming valve), and am wondering if I really need these?
Does anyone have any examples of how these are installed?, pics?
Any help is greatly appriciated.
I'm in the process of assembling my pool system, and and going to use the BBB method, but wanted a continuous dosing of the bleech as to consistantly maintain the FC level rather than have the swings from too much to too little, I know I will still need to adjust for weather and bather load, but figure it will still be minimal.
Anyways, I have aquired an LMI P121-158 dosing pump for cheap, but it didn't come with the foot valve or the 4FV (priming valve), and am wondering if I really need these?
Does anyone have any examples of how these are installed?, pics?
Any help is greatly appriciated.