    Ok I got the site all level and blocks in. Just test fitting the bottom rail again. Did anyone mark 12' on a string and try and get the ring round or did you just put all the rail sections into the plates up to the stop then put the wall in and adjust from there? Just asking for now soon am going to rent the backhoe to dig down the deep end.
    1988 Ceder Ridge
    24' Doughboy AGP

  2. Back To Top    #2
    Melt In The Sun's Avatar
    Join Date
    Oct 2009
    Location
    Tucson, AZ
    Posts
    3,899

    Re: need some advise from doughboy owners

    I just know some people can help. Not me though...
    11,200 gal, Pebble-Tec; Tristar 2-speed 1hp - Swimclear 325 ft2 cart - SWG - A & A in-floor cleaner - Heat pump. For the poolside cooking, a Yoder Wichita and a Big Steel Keg!
    TF Test Kits -- PoolMath -- Pool School
    Make each day your masterpiece. - John Wooden

  3. Back To Top    #3
    fordman's Avatar
    Join Date
    Jul 2009
    Location
    Iowa
    Posts
    119

    Re: need some advise from doughboy owners

    well I getting to the point where I just need to do. So am in the process of digging out the middle so maybe next week get the sand. wanting to get it up and finished.
    1988 Ceder Ridge
    24' Doughboy AGP

  4. Back To Top    #4

    Join Date
    Apr 2007
    Location
    West Michigan
    Posts
    108

    Re: need some advise from doughboy owners

    We did the string thing and used a laser level. SIL who builds houses put our pool in,( his first pool install.) We tried to dig out the center of our pool, but in the end it wasn't that much. If we ever replace the liner we'll have the pros do it and do the deep end correctly. But for now its just fine. Better than putting up and taking down the Intex. Good Luck, Kimrst
    5 years 18' Intex Frame pool, July 2009 upgrade, 28ft rnd used Doughboy, 1hs Hayward Power Flow pump, Doughboy DE filter.TF test kit

  5. Back To Top    #5
    fordman's Avatar
    Join Date
    Jul 2009
    Location
    Iowa
    Posts
    119

    Re: need some advise from doughboy owners

    Did you see any of the bottom rail during the install. Just wondering if all the rails were against the plate stops ?