Become a TFP Supporter Pool Math Forum Rules Pool School
Results 1 to 2 of 2

Thread: Which gets installed first?

  1. Back To Top    #1

    Which gets installed first?

    1st time posting.

    I have a 21' round, Johnny Weismuller above ground pool. I'm going to install a new beaded liner and want to do it right this time. This time I plan on putting in a Gorilla bottom pad and some wall foam. I have a stone dust bottom and bought an oversized floor pad so I could overlap it with the wall foam, and limit the liners contact with the stone dust. The stone dust also provides my angled transition to the pool wall, no cove.

    These are my questions / problems

    1)Should do I remove the stone dust to install the wall foam? I planned on leaving it, but if it's better to cover the whole wall, I might consider moving it. Lots O work

    2) should I run the floor pad up the wall a certain distance and overlap it with the foam? or should the foam be first, with the floor pad coming up the wall? and how much should I overlap it?

    3) Is there a minimum temperature to install a liner? Someone said 80 degrees.

    Thanks in advance for any input.

  2. Back To Top    #2
    Mod Squad Bama Rambler's Avatar
    Join Date
    Jun 2009
    SouthWest Alabama

    Re: Which gets installed first?

    I'm not sure it matters but I would install the bottom and then the wall foam. I wouldn't lap the bottom very far up the wall. You'll need to do some creative notching to keep the bottom and foam from folding if you try and cover the cove with it.
    Dave J. TFP Moderator
    24' x 52" Round AGP. 2hp/¼hp SPL Power-Flo 2-speed pump. 200sqft Waterway Cartridge Filter. 45MHP2(3GPD) Stenner Peristaltic Pump
    Pool School ----- Pool Math ----- TF-Test Kit

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts